Development of Preili region business environment infrastructure (Q3057507)

From EU Knowledge Graph
Revision as of 14:05, 10 September 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3057507 in Latvia
Language Label Description Also known as
English
Development of Preili region business environment infrastructure
Project Q3057507 in Latvia

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    3,455,618.0 Euro
    0 references
    4,342,106.49 Euro
    0 references
    0.8 percent
    0 references
    5 February 2018
    0 references
    4 August 2021
    0 references
    Preiļu novada pašvaldība
    0 references
    0 references

    56°16'49.73"N, 26°43'2.68"E
    0 references

    56°16'49.73"N, 26°43'2.68"E
    0 references

    56°16'52.54"N, 26°43'21.07"E
    0 references

    56°17'37.46"N, 26°43'36.01"E
    0 references

    56°17'8.77"N, 26°43'34.50"E
    0 references
    Projekta vispārējais mērķis - teritoriju revitalizācija, reģenerējot degradētās teritorijas atbilstoši Preiļu novada attīstības programmai, nodrošinot videi draudzīgu un vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu. Projekta plānotās aktivitātes: 1. Rietumu ielas izbūve. 2. Industriālās teritorijas izbūve Rietumu ielas pieguļošajā teritorijā. Projekta ilgums - 42 mēneši. Kopējās projekta izmaksas 5 541 255.88, no tām ERAF - 3 455 618.00. Projekta rezultātā tiks izbūvēta jauna iela 3.06 km garumā, kā arī izbūvēta industriālā zona ar tipveida ēkām, kas publiskas izsoles rezultātā tiks iznomāta komersantam. Projekta rezultātā tiks sasniegti plānotie iznākuma rādītāji: radītas 57 darba vietas un veikto investīciju apjoms savos nemateriālajos ieguldījumos un pamatlīdzekļos nebūs mazāks kā 3 455 618,00 EUR. (Latvian)
    0 references
    The overall objective of the project is to revitalise the territories by regenerating degraded areas in accordance with the Preili Regional Development Programme, ensuring environmentally friendly and environmental sustainability-friendly territorial growth and job creation. Planned activities of the project: 1. Construction of Western Street. 2. Construction of industrial territory in the surrounding area of Rietumu Street. Project duration – 42 months. Total project costs 5 541 255.88, of which ERDF – 3 455 618.00. As a result of the project a new street of 3.06 km will be built, as well as an industrial zone with standard buildings will be built, which will be rented to the merchant as a result of a public auction. The planned output indicators will be achieved as a result of the project: 57 jobs have been created and the amount of investment made in their intangible and fixed assets will not be less than EUR 3455618.00. (English)
    15 July 2021
    0 references
    Rīgas iela, Preiļi, Preiļu nov.
    0 references
    Preiļi, Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Preiļi, Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Andreja Upīša iela 30, Preiļi, Preiļu nov., LV-5301
    0 references
    Preiļi, Preiļu nov.
    0 references
    Preiļi, Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Preiļu pag., Preiļu nov.
    0 references
    Andreja Upīša iela, Preiļi, Preiļu nov.
    0 references
    Daugavpils iela, Preiļi, Preiļu nov.
    0 references

    Identifiers

    5.6.2.0/16/I/013
    0 references