Reconstruction of national regional road P73 Vecumnieki – Nereta – Subate section Valle parish border – bridge over Iecava (km 7.30-20.89) (Q3057622)
Jump to navigation
Jump to search
Project Q3057622 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of national regional road P73 Vecumnieki – Nereta – Subate section Valle parish border – bridge over Iecava (km 7.30-20.89) |
Project Q3057622 in Latvia |
Statements
10,075,086.25 Euro
0 references
11,853,042.65 Euro
0 references
0.85 percent
0 references
1 June 2016
0 references
30 September 2018
0 references
Satiksmes ministrija
0 references
Projekta mērķis ir valsts reģionālā autoceļa P73 Vecumnieki – Nereta – Subate posma Valles pagasta robeža – tilts pār Iecavu (km 7,30 – 20,89), Iecavas tilta, Vārnupītes (Pančupītes) un Svētupītes caurtekas pārbūves darbi, kas ietver segas izbūvi, būvuzraudzību, autoruzraudzību un zemju iegādi. Plānotais kopējais projekta īstenošanas ilgums 28 mēneši. Projekta plānotās kopējās izmaksas 13 572 950,22 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums – 11 537 007,69 euro un valsts budžeta finansējums – 2 035 942,53 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P73 Vecumnieki – Nereta – Subate posms Valles pagasta robeža – tilts pār Iecavu (km 7,30 – 20,89), ieskaitot tiltu par Iecavu, Vārnupītes (Pančupītes) un Svētupītes caurtekas – 13,59 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
0 references
The aim of the project is the construction works of the state regional road P73 Vecumnieki – Nereta – Subate section Valle Parish – bridge over Iecava (km 7.30-20.89), Iecava bridge, Vārnupīte (Pančupīte) and Svētupīte duct, which include construction, construction supervision, author supervision and purchase of land. The total planned duration of the project is 28 months. The planned total cost of the project is EUR 13572950,22, including the planned European Regional Development Fund funding – EUR 11537007.69 and the state budget funding – EUR 2035942.53. As a result of the project the National Regional Road P73 Vecumnieki – Nereta – Subate section Valle Parish border – bridge over Iecava (km 7.30-20.89), including bridge about Iecava, Vārnupīte (Pančupīte) and Svētupīte ducts – 13.59 km. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
15 July 2021
0 references
Vecumnieku pag., Bauskas nov.
0 references
Valles pag., Bauskas nov.
0 references
Kurmenes pag., Bauskas nov.
0 references
Valles pag., Bauskas nov.
0 references
Valles pag., Bauskas nov.
0 references
Kurmenes pag., Bauskas nov.
0 references
Identifiers
6.3.1.0/16/I/007
0 references