Production line for finger-jointed construction wood as well as duo/triobalks and loading hall (Q3061385)

From EU Knowledge Graph
Revision as of 09:01, 3 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: appending fund and program to projects in Austria)
Jump to navigation Jump to search
Project Q3061385 in Austria
Language Label Description Also known as
English
Production line for finger-jointed construction wood as well as duo/triobalks and loading hall
Project Q3061385 in Austria

    Statements

    0 references
    9,000,000.0 Euro
    0 references
    12 July 2017
    0 references
    31 July 2019
    0 references
    Franz Kirnbauer KG;KIRNBAUER HOLZ LiegenschaftsGmbH
    0 references
    0 references

    47°42'23.76"N, 16°1'10.09"E
    0 references
    31839
    0 references
    Another production hall is being built at the Ternitz site, in which a production line (conveyor systems and press, wedge zinc and planing plants) is installed, which is specially designed for the processing of larger fin dimensions. (English)
    20 July 2021
    0 references
    Am Standort Ternitz wird eine weitere Produktionshalle errichtet, in der eine Produktionslinie (Förderanlagen und Presse, Keilzink- und Hobelanlagen) installiert wird, die speziell auf die Verarbeitung größerer Lamellendimensionen ausgelegt ist. (Austrian German)
    0 references
    Ternitz
    0 references

    Identifiers

    AUST-1097
    0 references