Construction of main road No 5 Pärnu-Rakvere-Sõmeru, Türi – Särevere section km 74.7-78.7 (Q3067950)

From EU Knowledge Graph
Revision as of 11:44, 16 August 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3067950 in Estonia
Language Label Description Also known as
English
Construction of main road No 5 Pärnu-Rakvere-Sõmeru, Türi – Särevere section km 74.7-78.7
Project Q3067950 in Estonia

    Statements

    0 references
    3,522,852.24 Euro
    0 references
    4,144,532.05 Euro
    0 references
    85.0 percent
    0 references
    22 July 2014
    0 references
    31 March 2016
    0 references
    Transpordiamet
    0 references
    0 references

    59°21'23.40"N, 24°37'49.04"E
    0 references
    10916
    0 references
    1. 3,795 km pikkuselt ja 9 m laiuselt uue asfaltbetoonkatte ja teekonstruktsiooni aluskihtide rekonstrueerimine; 2. Olemasoleva silla nr 220 Särevere sild asendamine uue sillaga; 3. Silla nr 219 Särevere mõisa sild remont; 4. 1,5 km pikkuse jalgratta- ja jalgtee ehitamine Kastani tn-st kuni Jaama tänavani; 5. 1,35 km ulatuses jalgtee remont ja ümberehitamine uue lahendusega kokkuviimiseks; 6. Riigimaanteede nr 5 ja nr 15 ristmike ümberehitus üherajaliseks ringristmikuks; 7. 2,57 km olemasoleva tänavavalgustuse ümberehitus; 8. Veoautode parkimiskohtade ja peatusmistaskute rajamine; 9. Bussipeatuste taskute ja ooteplatvormide ehitamine; 10. Sadevete äravoolusüsteemide ehitamine. Lisaks paigaldatakse ümber tehnovõrkusid ning rakendatakse erinevaid liiklusohutuse ja teekeskkonda parandavaid meetmeid. (Estonian)
    0 references
    1. Reconstruction of new asphalt concrete coating and road construction substrates of 3.795 km long and 9 m wide; 2. Replacement of the existing bridge No 220 Särevere with a new bridge; 3. Repair of bridge No 219 Särevere Manor; 4. Construction of 1.5 km cycling and footpath from Kastani Street to Jaama Street; 5. 1.35 km of footpath repair and reconstruction to connect with the new solution; 6. Conversion of intersections of national roads No 5 and No 15 into a single-lane roundabout; 7. 2,57 km of alteration of existing street lighting; 8. The establishment of parking places and stopping points for trucks; 9. Construction of bus stop pockets and platforms; 10. Construction of rainwater drainage systems. In addition, techno-networks will be re-installed and various measures to improve road safety and the road environment will be implemented. (English)
    16 August 2021
    0 references

    Identifiers

    2014-2020.10.01.001.01.15-0004
    0 references