Revision as of 11:44, 16 August 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): 1. Reconstruction of new asphalt concrete coating and road construction substrates of 3.795 km long and 9 m wide; 2. Replacement of the existing bridge No 220 Särevere with a new bridge; 3. Repair of bridge No 219 Särevere Manor; 4. Construction of 1.5 km cycling and footpath from Kastani Street to Jaama Street; 5. 1.35 km of footpath repair and reconstruction to connect with the new solution; 6. Conversion of intersections of national roads No...)
Jump to navigation Jump to search
Project Q3067950 in Estonia
Language Label Description Also known as
English
No label defined
Project Q3067950 in Estonia

    Statements

    0 references
    3,522,852.24 Euro
    0 references
    4,144,532.05 Euro
    0 references
    85.0 percent
    0 references
    22 July 2014
    0 references
    31 March 2016
    0 references
    Transpordiamet
    0 references
    0 references

    59°21'23.40"N, 24°37'49.04"E
    0 references
    10916
    0 references
    1. 3,795 km pikkuselt ja 9 m laiuselt uue asfaltbetoonkatte ja teekonstruktsiooni aluskihtide rekonstrueerimine; 2. Olemasoleva silla nr 220 Särevere sild asendamine uue sillaga; 3. Silla nr 219 Särevere mõisa sild remont; 4. 1,5 km pikkuse jalgratta- ja jalgtee ehitamine Kastani tn-st kuni Jaama tänavani; 5. 1,35 km ulatuses jalgtee remont ja ümberehitamine uue lahendusega kokkuviimiseks; 6. Riigimaanteede nr 5 ja nr 15 ristmike ümberehitus üherajaliseks ringristmikuks; 7. 2,57 km olemasoleva tänavavalgustuse ümberehitus; 8. Veoautode parkimiskohtade ja peatusmistaskute rajamine; 9. Bussipeatuste taskute ja ooteplatvormide ehitamine; 10. Sadevete äravoolusüsteemide ehitamine. Lisaks paigaldatakse ümber tehnovõrkusid ning rakendatakse erinevaid liiklusohutuse ja teekeskkonda parandavaid meetmeid. (Estonian)
    0 references
    1. Reconstruction of new asphalt concrete coating and road construction substrates of 3.795 km long and 9 m wide; 2. Replacement of the existing bridge No 220 Särevere with a new bridge; 3. Repair of bridge No 219 Särevere Manor; 4. Construction of 1.5 km cycling and footpath from Kastani Street to Jaama Street; 5. 1.35 km of footpath repair and reconstruction to connect with the new solution; 6. Conversion of intersections of national roads No 5 and No 15 into a single-lane roundabout; 7. 2,57 km of alteration of existing street lighting; 8. The establishment of parking places and stopping points for trucks; 9. Construction of bus stop pockets and platforms; 10. Construction of rainwater drainage systems. In addition, techno-networks will be re-installed and various measures to improve road safety and the road environment will be implemented. (English)