Construction of Dubina 3 photovoltaic power plant (Q2711213)

From EU Knowledge Graph
Revision as of 03:43, 26 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2711213 in Poland
Language Label Description Also known as
English
Construction of Dubina 3 photovoltaic power plant
Project Q2711213 in Poland

    Statements

    0 references
    1,184,164.81 zloty
    0 references
    263,239.84 Euro
    0.2223 Euro
    0 references
    2,204,267.15 zloty
    0 references
    490,008.59 Euro
    0.2223 Euro
    0 references
    53.72 percent
    0 references
    31 August 2020
    0 references
    31 December 2020
    0 references
    FOTOWOLTAIKA PODLASIE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    52°31'9.1"N, 23°21'43.2"E
    0 references
    Przedsięwzięcie dotyczy inwestycji z zakresu budowy nowej jednostki wytwarzania energii elektrycznej o mocy 999 kW wraz z podłączeniem do sieci dystrybucyjnej/przesyłowej zgodnie z dokumentacją techniczną na działkach o nr geod. 336/5 i 337/4, obręb Dubiny, gm. Hajnówka. Na elementy składowe instalacji farmy fotowoltaicznej składają się: − panele fotowoltaiczne krzemowe pogrupowane w zespoły do 4000 sztuk − inwertery DC/DC i Dc/Ac − stacja kontenerowa wraz z transformatorem − okablowanie pomiędzy panelami DC i AC − ocrhona przeciwpożarowa − pomiary − ogrodzenie terenu i instalacja monitoringu wizyjnego i alarmowego Projekt wprost realizuje Cel szczegółowy: Zwiększony udział rozproszonej produkcji energii ze źródeł odnawialnych Działania 5.1 RPOWP. Projekt dotyczy budowy instalacji fotowoltaicznej. Realizacja projektu przyczyni się do zwiększenia udziału energii odnawialnej w produkcji energii ogółem. Efektem realizacji działań będzie redukcja emisji CO2 i poprawa stanu środowiska. Realizacja projektu przyczyni się do osiągnięcia wskaźnika rezultatu RPOWP : Udział energii ze źródeł odnawialnych w końcowym zużyciu energii brutto z 15,5%w 2012 do 18,6% w 2023 r. Przedmiotowa inwestycja jest gotowa do realizacji, firma uzyskała wszystkie wymagane decyzje administracyjne. Rzeczowe zakończenie realizacji projektu zaplanowano do 12.2020r. Całkowity koszt inwestycji wynosi − brutto 3 820 594,73 zł, koszty kwalifikowalne projektu wynoszą - 2 204 267,15 zł, dofinansowanie - 1 184 164,81 zł. (Polish)
    0 references
    The project concerns an investment in the construction of a new electricity generation unit with a capacity of 999 kW with connection to the distribution/transmission network in accordance with the technical documentation on land plots with geod No. 336/5 and 337/4, Dubina, Hajnówka. The components of the installation of a photovoltaic farm consist of: − silicon photovoltaic panels grouped into units of up to 4000 units – DC/DC and Dc/Ac inverters – container station with transformer – wiring between DC and AC panels − fire protection ocrhona – measurements − terrain fence and video and alarm monitoring installation The project is directly implementing the Specific Objective: Increased share of distributed renewable energy production Measure 5.1 ROPWP. The project concerns the construction of a photovoltaic installation. The implementation of the project will contribute to increasing the share of renewable energy in total energy production. The implementation of the measures will result in a reduction of CO2 emissions and improvement of the environment. The implementation of the project will contribute to the achievement of the ROPWP result indicator: Share of energy from renewable sources in gross final consumption of energy from 15.5 %in 2012 to 18.6 % in 2023. This investment is ready for implementation, the company has obtained all the required administrative decisions. The material completion of the project is planned by 12.2020. The total investment cost is PLN 3 820 594.73 gross, the eligible costs of the project amount to – PLN 2 204 267.15 and the grant – PLN 1 184 164,81. (English)
    8 July 2021