Construction of a cogeneration module with a capacity of 0.9 MWe and 1.1 MWt supporting the operation of the geothermal-biomass heating plant in Sieradz (Q2692771)

From EU Knowledge Graph
Revision as of 22:42, 25 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2692771 in Poland
Language Label Description Also known as
English
Construction of a cogeneration module with a capacity of 0.9 MWe and 1.1 MWt supporting the operation of the geothermal-biomass heating plant in Sieradz
Project Q2692771 in Poland

    Statements

    0 references
    1,289,550.96 zloty
    0 references
    286,667.18 Euro
    0.2223 Euro
    0 references
    3,269,652.55 zloty
    0 references
    726,843.76 Euro
    0.2223 Euro
    0 references
    39.44 percent
    0 references
    28 December 2018
    0 references
    31 December 2022
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    51°36'6.5"N, 18°44'23.6"E
    0 references
    Celem inwestycji jest zmniejszenie emisyjności systemu ciepłowniczego Sieradza poprzez zmniejszenie wykorzystania obecnie stosowanych kotłów węglowych oraz wykorzystanie wysokosprawnej kogeneracji do zmniejszenia kosztów zakupu energii elektrycznej. Przedsięwzięcie będzie zlokalizowane w miejscowości Sieradz (gmina: Sieradz, powiat: sieradzki, województwo: łódzkie). Rodzaj poniesionych wydatków: Dostawa maszyn i urządzeń – koszty kwalifikowane Działania promocyjne – koszty niekwalifikowane. Budowa modułu kogeneracyjnego stanowi element całościowego systemu rozbudowy ciepłowni CM1 w kierunku ciepłowni geotermalno-biomasowej. Projekt obejmuje: Moduł kogeneracyjny o mocy elektrycznej 0,9 MWe oraz cieplnej 1,1 MWt na gaz ziemny w zabudowie kontenerowej oraz koszty instalacyjne (budowa fundamentów, wyprowadzenie energii elektrycznej, wyprowadzenie ciepła, doprowadzenie gazu, wieża chłodnicza). (Polish)
    0 references
    The objective of the investment is to reduce the decarbonisation of the Sieradza district heating system by reducing the use of currently used coal boilers and using high-efficiency cogeneration to reduce the cost of purchasing electricity. The project will be located in Sieradz (municipality: Sieradz, county: Sieradzki, Voivodeship: ÅÃ3dÅo). Type of expenditure incurred: Delivery of machinery and equipment – eligible costs Promotion measures – ineligible costs. The construction of the cogeneration module is part of the overall expansion system of the CM1 heat plant towards a geothermal-biomass heating plant. The project includes: Cogeneration module with a capacity of 0.9 MWe and a thermal capacity of 1.1 MWt for natural gas in container housing and installation costs (construction of foundations, electricity output, heat extraction, gas supply, cooling tower). (English)
    7 July 2021
    0 references

    Identifiers

    POIS.01.06.01-00-0029/19
    0 references