Construction of cogeneration 2.5 MWe (Q2692767)

From EU Knowledge Graph
Revision as of 22:42, 25 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2692767 in Poland
Language Label Description Also known as
English
Construction of cogeneration 2.5 MWe
Project Q2692767 in Poland

    Statements

    0 references
    1,690,910.52 zloty
    0 references
    375,889.41 Euro
    0.2223 Euro
    0 references
    4,500,000.0 zloty
    0 references
    1,000,350.0 Euro
    0.2223 Euro
    0 references
    37.58 percent
    0 references
    28 December 2018
    0 references
    31 December 2021
    0 references
    PKE ENERGIA EMILIA KOCISZEWSKA PIOTR KOCISZEWSKI S.C.
    0 references
    0 references

    52°4'41.9"N, 21°15'2.9"E
    0 references
    CELE PROJEKTU Głównym celem projektu, polegającego na powstaniu elektrociepłowni gazowej o łącznej zainstalowanej mocy 4,93 MW, w tym moc elektryczna 2,535 MW i moc cieplna 2,398 MW, zlokalizowanej w Dziecinowie, jest wytwarzanie energii elektrycznej i cieplnej w skojarzeniu, przy jednoczesnym zwiększeniu efektywności energetycznej oraz zastąpienie energii produkowanej z węgla kamiennego.ZAKRES PRZEDMIOTOWY PROJEKTU 1. Przygotowanie niezbędnej dokumentacji i uzyskanie niezbędnych pozwoleń administracyjnych 2. Wybór wykonawcy lub wykonawców projektu 3. Dostawa, montaż i uruchomienie instalacji kogeneracyjnej 4. Dostawa, montaż i uruchomienie układu odzysku ciepła, w tym ciepła niskotemperaturowego. 5. Dostawa, montaż i uruchomienie układ oczyszczania spalin SCR 6. Informacja i promocja 7. Uruchomienie instalacji Do kosztów kwalifikowalnych projektu zaliczają się koszty związane z realizacją zadań nr 3, 4, 5. Pozostałe zadania będą realizowane ze środków własnych Wnioskodawcy. Łącznie koszty inwestycji wynoszą: 5 537 460,00 PLN brutto, z czego koszty kwalifikowalne wynoszą 4 500 000,00 PLN, a koszty niekwalifikowane wyniosą 1 037 460,00 PLN, w tym VAT 1 035 460,00 PLN. Kwota dofinansowania wynosi 1 690 910,52 PLN, czyli 37,58%. Zaawansowanie administracyjne: • prawo do nieruchomości • inwestycja nie wymaga oceny o oddziaływaniu na środowisko, ponieważ nie należy do rodzajów przedsięwzięć wymienionych w Rozporządzeniu Ministrów z dnia 9 listopada 2010 roku w sprawie przedsięwzięć mogących znacząco oddziaływać na środowisko • złożony wniosek o wydanie deklaracji organu odpowiedzialnego za gospodarkę wodną • złożony wniosek o wydanie zaświadczenia Natura 2000 • warunki przyłączenia do sieci gazowej • studium wykonalności, • zagwarantowany wkład pieniężny w kwocie 15% kosztów kwalifikowanych • złożony wniosek o wydanie promesę. Wszelkie urządzenia na trwałe „zamontowane” w projekcie będą nowe oraz spełniają normy ekologiczne UE zamieszczone w obwieszczeniu Prezesa Polskie (Polish)
    0 references
    Objectives OF THE PROJECT The main objective of the project, which consists of the construction of a gas heat and power plant with a total installed capacity of 4.93 MW, including an electrical capacity of 2,535 MW and a thermal input of 2,398 MW, located in Dziecinów, is to generate electricity and heat in combination, while increasing energy efficiency and replacing energy produced from hard coal. Preparation of the necessary documentation and obtaining the necessary administrative permits 2. Selection of the contractor(s) of project 3. Delivery, assembly and commissioning of cogeneration installation 4. Supply, assembly and commissioning of a heat recovery system, including low-temperature heat. 5. Delivery, assembly and commissioning of the SCR 6 exhaust aftertreatment system. Information and promotion 7. Start-up of the installation The eligible costs of the project include costs related to the implementation of tasks 3, 4, 5. The remaining tasks will be carried out from the Applicant’s own resources. The total investment costs are: PLN 5 537 460.00 gross, of which the eligible costs amount to PLN 4 500 000.00 and ineligible costs will be PLN 1 037 460.00, including VAT PLN 1 035 460.00. The amount of the co-financing is PLN 1 690 910.52 or 37.58 %. Administrative advancement: • property rights • the investment does not require an environmental impact assessment, as it does not belong to the types of projects listed in the Cabinet Regulation of 9 November 2010 on projects likely to have significant effects on the environment • submitted application for a declaration by the water authority • submitted application for a Natura 2000 certificate • conditions for connection to the gas network • feasibility study, • guaranteed cash contribution of 15 % of eligible costs • submitted request for a promise. Any equipment permanently “assembled” in the project will be new and meet the EU ecological standards set out in the announcement of the President of Poland (English)
    7 July 2021
    0 references

    Identifiers

    POIS.01.06.01-00-0023/19
    0 references