Developing innovations in logistics processes in line with the concept of Industry 4.0 in pharmaceutical distribution (Q2686875)

From EU Knowledge Graph
Revision as of 21:12, 25 July 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q2686875 in Poland
Language Label Description Also known as
English
Developing innovations in logistics processes in line with the concept of Industry 4.0 in pharmaceutical distribution
Project Q2686875 in Poland

    Statements

    0 references
    11,890,560.48 zloty
    0 references
    2,643,271.59 Euro
    0.2223 Euro
    0 references
    29,726,401.2 zloty
    0 references
    6,608,178.99 Euro
    0.2223 Euro
    0 references
    40.0 percent
    0 references
    1 February 2021
    0 references
    31 December 2022
    0 references
    PRZEDSIĘBIORSTWO DYSTRYBUCJI FARMACEUTYCZNEJ SLAWEX SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    50°12'34.6"N, 19°7'55.9"E
    0 references
    Celem projektu jest opracowanie innowacyjnego w skali kraju procesu logistyki magazynowej, poprzez synergiczne połączenie rozproszonych stanowisk o różnym przeznaczeniu, co zapewni płynną i dynamiczną realizację procesów logistycznych oraz pozwoli na: -ograniczenie ilości błędów w kompletacji zamówień farmaceutycznych, -zwiększenie efektywności wykorzystania powierzchni magazynowej, -red. czasu realizacji zamówień, -zwiększenie ilości obsługiwanych zamówień w jednostce czasu. Rezultat Projektu odpowie na potrzeby Spółki wynikające z I. uwarunkowań zewn. tj.: 1)podwyższenie dynamiki i utrzymanie szybkiego tempa realizacji zamówień celem sprostania narastającemu popytowi na produkty farmaceutyczne; 2)osiągniecie wysokiego poziomu elastyczności w stosunku do reakcji na składane zamówienia, poprzez utrzymanie wysokiego poziomu „zatowarowania” magazynu; 3)dostosowanie profilu oferty do zmieniającej się struktury odbiorców, rosnącego udziału aptek sieciowych, zmniejszania się udziału aptek indywidualnych II. potrzeb wewn., tj.: 1.dążenie do wyeliminowania tzw. wąskich gardeł w procesie; 2.problemy z pozyskaniem kadry, fluktuacja personelu, błędy ludzkie zakłócające proces; 3.konieczność stałego obniżania kosztów prowadzonej działalności. Wdrożenie rezultatu Projektu umożliwi: 1)elastyczną i bezbłędną kompletację wyrobów farmaceut. wg zamówień klientów; 2)automat, weryfikację skompletowanych zamówień przed wydaniem do klienta; 3)kompleksową obsługę towarów zwróconych, umożliwiając ich ponowną automatyczną kompletację; 4)optymalne i automatyczne zatowarowanie magazynu. Powyższe zostanie osiągnięte dzięki zaplanowanym pracom rozwojowym (etap 1, 2 i 3) w oparciu o zasoby kadrowe i techniczne oraz know-how Spółki. Wdrożenie rezultatów odbędzie się po (Polish)
    0 references
    The aim of the project is to develop an innovative warehouse logistics process on a national scale, through a synergistic combination of distributed positions for different purposes, which will ensure smooth and dynamic implementation of logistics processes and allow for: —limiting the number of errors in the completion of pharmaceutical orders, -increase the efficiency of the use of warehouse space, -ed. the time of order processing, -increase the number of orders handled in the time unit. The result of the project will respond to the Company’s needs arising from the first. external conditions, i.e.: 1) to increase the dynamism and maintain a fast pace of order delivery in order to meet the growing demand for pharmaceutical products; 2)achieve a high level of flexibility in relation to the response to placed orders, by maintaining a high level of &Amp;bdquo;restocking” warehouse; 3)Adjusting the offer profile to the changing structure of customers, increasing share of network pharmacies, decreasing share of individual pharmacies II. internal needs, i.e.: 1. striving to eliminate so-called bottlenecks in the process; 2.Human gain problems, staff fluctuation, human errors disrupting the process; 3.the need to continuously reduce the costs of the business. Implementation of the result of the project will enable: 1)flexible and flawless completion of pharmacist’s products. according to customer orders; 2)automatic, verification of completed orders before delivery to the customer; 3)comprehensive handling of returned goods, enabling them to be re-complete automatically; 4)optimal and automatic stocking. The above will be achieved thanks to planned development works (steps 1, 2 and 3) based on the Company’s human and technical resources and know-how. Implementation of the results will take place after (English)
    7 July 2021
    0 references

    Identifiers

    POIR.01.01.01-00-1392/20
    0 references