Production line for finger-jointed construction wood as well as duo/triobalks and loading hall (Q3061385)

From EU Knowledge Graph
Revision as of 11:49, 20 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Am Standort Ternitz wird eine weitere Produktionshalle errichtet, in der eine Produktionslinie (Förderanlagen und Presse, Keilzink- und Hobelanlagen) installiert wird, die speziell auf die Verarbeitung größerer Lamellendimensionen ausgelegt ist.)
Jump to navigation Jump to search
Project in Austria 1097
Language Label Description Also known as
English
Production line for finger-jointed construction wood as well as duo/triobalks and loading hall
Project in Austria 1097

    Statements

    0 references
    9,000,000.0 Euro
    0 references
    12 July 2017
    0 references
    31 July 2019
    0 references
    Franz Kirnbauer KG;KIRNBAUER HOLZ LiegenschaftsGmbH
    0 references

    47°42'23.76"N, 16°1'10.09"E
    0 references
    31839
    0 references
    Am Standort Ternitz wird eine weitere Produktionshalle errichtet, in der eine Produktionslinie (Förderanlagen und Presse, Keilzink- und Hobelanlagen) installiert wird, die speziell auf die Verarbeitung größerer Lamellendimensionen ausgelegt ist. (German)
    0 references
    Another production hall is being built at the Ternitz site, in which a production line (conveyor systems and press, wedge zinc and planing plants) is installed, which is specially designed for the processing of larger fin dimensions. (English)
    20 July 2021
    0 references
    Am Standort Ternitz wird eine weitere Produktionshalle errichtet, in der eine Produktionslinie (Förderanlagen und Presse, Keilzink- und Hobelanlagen) installiert wird, die speziell auf die Verarbeitung größerer Lamellendimensionen ausgelegt ist. (Austrian German)
    0 references
    Ternitz
    0 references

    Identifiers

    AUST-1097
    0 references