Reconstruction of the national regional road P62 Krāslava – Preili – Madona section Krāslava – Kraslava station km 0.80-4.00 (bridge) (Q3057646)

From EU Knowledge Graph
Revision as of 12:47, 15 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3057646 in Latvia
Language Label Description Also known as
English
Reconstruction of the national regional road P62 Krāslava – Preili – Madona section Krāslava – Kraslava station km 0.80-4.00 (bridge)
Project Q3057646 in Latvia

    Statements

    0 references
    0 references
    2,812,904.73 Euro
    0 references
    3,309,299.68 Euro
    0 references
    28 June 2016
    0 references
    27 July 2019
    0 references
    Satiksmes ministrija
    0 references
    0 references

    55°55'30.14"N, 27°5'40.16"E
    0 references
    Projekta mērķis ir valsts reģionālā autoceļa P62 Krāslava - Preiļi - Madona posma Krāslava – Krāslavas stacija km 0,80 – 4,00, Jāņupītes tilta pārbūves darbus, kas ietver segas izbūvi, būvuzraudzību, autoruzraudzību. Plānotais kopējais projekta īstenošanas ilgums 37 mēneši. Projekta plānotās kopējās izmaksas 3 720 373,93 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums –3 162 317,84 euro un valsts budžeta finansējums – 558 056,09 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P62 Krāslava - Preiļi - Madona posma Krāslava – Krāslavas stacija km 0,80 – 4,00, ieskaitot Jāņupītes – 3,20 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
    0 references
    The aim of the project is the state regional road P62 Krāslava – Preili – Madona section Krāslava – Kraslava station km 0.80-4.00, reconstruction works of the Jāņupīte bridge, which include construction of a duvet, construction supervision, author supervision. The total planned duration of the project is 37 months. The estimated total cost of the project is EUR 3720373,93, including the planned European Regional Development Fund funding – EUR 3 162317,84 and the state budget funding – EUR 558056.09. As a result of the project, the state regional road P62 Krāslava – Preili – Madona section Krāslava – Krāslava station will be arranged at km 0.80-4.00, including Jāņupīte – 3.20 km. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
    15 July 2021
    0 references
    Ūdrīšu pag., Krāslavas nov.
    0 references
    Ūdrīšu pag., Krāslavas nov.
    0 references
    Ūdrīšu pag., Krāslavas nov.
    0 references

    Identifiers

    6.3.1.0/16/I/013
    0 references