Improvement of energy efficiency for municipal cultural institution – Apes folk house and library – Skolas iela 4, Apē, Apes Municipality (Q3057181)
Jump to navigation
Jump to search
Project Q3057181 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of energy efficiency for municipal cultural institution – Apes folk house and library – Skolas iela 4, Apē, Apes Municipality |
Project Q3057181 in Latvia |
Statements
157,346.56 Euro
0 references
326,377.44 Euro
0 references
4 September 2018
0 references
3 October 2019
0 references
Apes novada dome
0 references
Projekta mērķis ir samazināt primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, veicot ieguldījumus Apes tautas nama un bibliotēkas ēkā, atbilstoši pašvaldības attīstības programmā noteiktajām prioritātēm.Projekta ietvaros plānots īstenot šādas atbalstāmās aktivitātes:1.ēkas energosertikāta izstrāde2. būvniecības ieceres dokumentācijas izstrāde; pagaidu energosertikāta izstrāde;3.Būvdarbi, kas attiecināmi uz energoefektivitātes paaugstināšanu:3.1. fasādes siltināšana;3.2.cokola sienu siltināšana;3.3. bēniņu pārseguma papildus siltināšana;3.4. esošo logu nomaiņa pret siltumnorīgākiem;3.5. ārdurvju nomaiņa.4. Būvdarbi, kas attiecināmi uz ēkas tehnisko sistēmu uzlabošanu:4.1.divcauruļu apkures sistēmas izveide;4.2. jauna centrālapkures katla uzstādīšana;4.3. katlu telpas un kurināmā noliktavas izbūve;4.4. siltumapgādes pievada izbūve;4.5. katlu telpas elektroapgādes, ūdensapgādes un un kanalizācijas pievadu izbūve.5. Ēkas kosmētiskā remonta darbi un teritorijas labiekārtošanas darbi (iekļaujami, kā neattiecināmās izmaksas)5.1. zāles kosmētiskais remonts;5.2. teritorijas labiekārtošanas darbi;5.3. fasādes apgaismojuma izbūves darbi.6. Būvuzraudzība;7.Autoruzraudzība;8.Publicitātes pasākumi;9.Monitoringa veikšana pēc projekta realizācijas.Lai pēc energoefektivitātes darbu pabeigšanas, ēkas iekšpuse un apkārtne atbilstu sabiedriskās ēkas statusam, būtu estētika un funkcionāla, tiks veikti arī iekštelpu kosmētiskā remonta un ēkai piegulošās teritorijas labiekārtošanas darbi, kas projektā iekļaujamas kā papildus veicamie darbi. Kā arī papildus nepieciešams izbūvēt atsevišķi stāvošu katlu māju ar kurināmā noliktavu un pievedtīklus.Projekta rezultātā tiks samazināts primārās enerģijas patēriņš par 60.46%, kā arī kopējais projekta oglekļa dioksīda emisijas apjoms par 67.48%. Galvenie ieguvēji un labuma guvēji, primāri, ir pašvaldība, kurai tiks samazinātas sabiedriskās ēkas Skolas ielā 4, Apē ekspluatācijas izmaksas turpmākos gados, radīta siltumenerģijas ekonomija un sekundāri, tie ir pašvaldības iedzīvotāji, kas projekta rezultātus izjutīs vistiešākajā veidā: samazināsies apkures radīto dūmgāzes piesārņojuma apjoms pilsētā, ievērojami uzlabosies temperatūras līmenis ēkā, kas radīs patīkamu un komfortablu uzturēšanos tajā, kā arī uzlabotais apkārtējais vides un iekštelpu estētiskais veidols veidos gandarījumu un lepnumu par savu piederību novadam. Projekta kopējās izmaksas ir EUR 507 322,01, no tā attiecināmās 330 470,21 EUR, neattiecināmās izmaksas 176 851,80 EUR”.Attiecināmas izmaksas sadalās - ERAF finansējums 159 318.00 EUR, valsts budžeta dotācija pašvaldībām 8 434.53 EUR, pašvaldības finansējums sastāda 162 717.68 EUR. Pašvaldības finansējuma pieaugums saistīts ar apstākli, ka apkures katlu un kurināmā noliktavu nebija iespējams izvietot esošā ēkā, bija nepieciešams būvēt atsevišķu ēku un inženierpievadus.Neattiecināmās izmaksās iekļauti galveno telpu kosmētiskā remonta darbi, ēkas fasādes apgaismojuma darbi un teritorijas labiekārtošanas darbi, kurus pilnā apjomā finansēs pašvaldība no aizņēmuma līdzekļiem.Plānotais projekta ilgums – 13 mēneši. (Latvian)
0 references
The aim of the project is to reduce primary energy consumption by promoting energy efficiency and reduction of municipal expenditure on heating by investing in the building of the Ape People’s House and library, in accordance with the priorities set out in the local government development programme. Development of documentation of the construction plan; Development of a temporary energy supply system;3.Constructions related to energy efficiency improvement:3.1. Facade insulation; 3.2. school wall insulation;3.3. Additional insulation of attic cover;3.4. Replacement of existing windows with thermaler;3.5. Replacement of external doors.4. Construction works related to improvement of the technical systems of the building: 4.1. development of double-pipe heating system;4.2. Installation of a new central heating boiler;4.3. Construction of boiler room and fuel warehouse;4.4. Construction of a heat supply;4.5. Construction of power supply, water supply and sewers in the boiler room.5. Cosmetic repair works of the building and territory improvement works (included, as ineligible costs)5.1 cosmetic repair of the hall;5.2. territory improvement works; 5.3. facade lighting construction works.6. Construction supervision;7.Authority supervision;8.Publicity measures;9.Monitoring after the completion of the project.In order to conform to the status of public building, after completion of the energy efficiency works, the interior and surroundings of the building would be aesthetic and functional, as well as cosmetic renovation of the indoor premises and improvement of the territory adjacent to the building, which should be included as additional works to be carried out in the project. It is also necessary to build a separate boiler house with fuel storage and feeder networks.As a result of the project, primary energy consumption will be reduced by 60.46 %, as well as total carbon dioxide emissions of the project by 67.48 %. The main beneficiaries and beneficiaries are, primarily, the municipality, which will reduce the operating costs of the public buildings at 4 Skolas Street, Ape in the coming years, create thermal energy savings and secondary, they are residents of the municipality, who will experience the project results in the most direct way: The amount of flue gas pollution caused by heating will be reduced in the city, the temperature level of the building will improve significantly, which will result in a pleasant and comfortable stay, as well as the improved surrounding and indoor aesthetic appearance will create satisfaction and pride in its belonging to the county. The total cost of the project is EUR 507 322.01, of which eligible EUR 330470,21, ineligible costs EUR 176851,80.The eligible costs are divided – ERDF financing EUR 159318.00, state budget grant to municipalities EUR 8434.53, municipal funding is EUR 162717.68. Increase of municipal funding is due to the fact that the boiler and fuel storage could not be located in the existing building, it was necessary to build separate building and engineering cables.Ineligible costs include the cost of the main premises, the cost of the building, the total amount of the building and fuel storage. (English)
15 July 2021
0 references
Skolas iela 4, Ape, Smiltenes nov., LV-4337
0 references
Identifiers
4.2.2.0/17/I/083
0 references