No label defined (Q3057088)

From EU Knowledge Graph
Revision as of 12:41, 15 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Within the framework of the project “Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution No.28 – Liepājas Street 37, Daugavpils” the reconstruction of the building to ensure energy efficiency improvement is envisaged. The aim of the project shall be: Promote improvement of energy efficiency of Daugavpils city 28th preschool educational institution building at Liepaja Street 37 by reducing primary energy consumptio...)
Jump to navigation Jump to search
Project Q3057088 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3057088 in Latvia

    Statements

    0 references
    0 references
    388,959.51 Euro
    0 references
    478,954.66 Euro
    0 references
    18 February 2019
    0 references
    17 August 2021
    0 references
    DAUGAVPILS PILSĒTAS DOME
    0 references
    0 references

    55°52'58.55"N, 26°33'1.91"E
    0 references
    Projekta “Energoefektivitātes paaugstināšana Daugavpils pilsētas pirmsskolas izglītības iestādē Nr.28 - Liepājas ielā 37, Daugavpilī” apraksts” ietvaros ir paredzēta iestādes ēkas pārbūve energoefektivitātes paaugstināšanas nodrošināšanai. Projekta mērķis: sekmēt Daugavpils pilsētas 28.pirmsskolas izglītības iestādes ēkas Liepājas ielā 37 energoefektivitātes paaugstināšanu, samazinot primārās enerģijas patēriņu.Projekta galvenās darbības:•Projekta pamatojošās dokumentācijas izstrādāšanaoBūvprojekta izstrāde;oBūvprojekta ekspertīzes veikšana.•Būvdarbu veikšanaoĀrējās fasādes nosiltināšana;oCokola siltināšana;oJumta pārsegumu nosiltināšana;oPagraba pārsegumu nosiltināšana;oVentilācijas sistēmas izbūve;oApkures sistēmas rekonstrukcija;oApgaismojuma nomaiņa.•Autoruzraudzība•Būvuzraudzība•Projekta publicitātes nodrošināšana•Būves nodošana ekspluatācijāProjekta ilgums: projekta aktivitātes tika uzsāktas 2016.gadā, pirms vienošanās par projekta īstenošanu parakstīšanas. Projekta īstenošana nodrošinās pašvaldības izglītības pakalpojumu kvalitāti un šo iestāžu energoefektivitātes palielināšanu, kā arī uzlabos ēku ārējo izskatu un pilsētvides pievilcību.Plānotais projekta īstenošanas ilgums: 30 mēneši.Darbi tika uzsākti 2016.gada 17.augustā, kad tika noslēgts līgums par būvprojekta minimāla sastāvā, būvprojekta izstrādi un autoruzraudzību būvobjektam “28. pirmsskolas izglītības iestādes ēkas energoefektivitātes paaugstināšana, vides pieejamības prasību nodrošināšana”.Projekta kopējās izmaksas: EUR 1 023 432.42, t.sk.attiecināmās izmaksas EUR 478 954.66, t.sk. ERAF finansējums ir EUR 388 959.51Projekta plānotie rezultāti:•tiks samazināts primārās enerģijas patēriņš un siltumnīcefekta gāzu emisijas, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, •tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika”. (Latvian)
    0 references
    Within the framework of the project “Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution No.28 – Liepājas Street 37, Daugavpils” the reconstruction of the building to ensure energy efficiency improvement is envisaged. The aim of the project shall be: Promote improvement of energy efficiency of Daugavpils city 28th preschool educational institution building at Liepaja Street 37 by reducing primary energy consumption.Project main activities:•Project supporting documentation Development of construction project expertise;OConstruction of project expertise.•Construction of constructional facadesInsulating the external facades;OOCokola Insulation;oInsurance of the cover;oInsurance of building blocksInsurance of external facades•Insurance of the project in service•Publication of duration of project.OInsurance of the cover;Outhorisation of the cover;Insurance of the project in service•Projection duration•Ventation of the project;OAuthorisation of construction;OBuperation supervision;Probrication of project duration•Conditioning of project;Outhorisation of construction;Outhoral supervision of insucuracy of project in service•Presentation of project in service•Voration of project;OBuling of constructions;Outhoral supervision of in-service systems•Presentation of project in service•Construction of project insulation;OInsulate of construction;OInsulation of project coverage;OBuclear construction;Probrication in service•Construction of project;OInsulation of the project;OInsulation of the project;OInsulation of the project;OInsulation of construction works;OConstruction of construction worksInsulating the construction of external facades•Insulation of the project;OBoCokola Insulation;oInsulation of the coverings of the project;OBubric supervision of the construction of the project in service•Pre-servicesCondition of the project•Condition of the project;OInsulation of covers;OBuration of the basement:insulation of external facades•Insulation of project in service•Publication of the project;OInsulsion of construction;Oauticulty of construction of building covers;Insulating the construction of external facades•Pro Project activities started in 2016, before signing the agreement on project implementation. Project implementation will ensure the quality of municipal education services and increase the energy efficiency of these institutions, as well as improve the external appearance of buildings and attractiveness of the urban environment. 30 months.Works were started on August 17, 2016, when the contract on construction project’s minimum composition, development of construction project and author supervision of the construction object “28 energy efficiency improvement of preschool institution building, provision of environmental accessibility requirements” was signed.Project total costs: EUR 1 023 432.42, of which eligible costs EUR 478 954.66, of which: ERDF funding is EUR 388 959.51Project’s planned results:•The primary energy consumption and greenhouse gas emissions will be reduced, contributing to the long-term improvement of energy efficiency and reduction of municipal expenditure on heating, • the energy efficiency requirements will be achieved in accordance with the Latvian building norm LBN 002-15 “Heat engineering of building envelopes”. (English)
    15 July 2021
    0 references
    Liepājas iela 37, Daugavpils, LV-5404
    0 references

    Identifiers

    4.2.2.0/18/I/063
    0 references