No label defined (Q3056986)

From EU Knowledge Graph
Revision as of 12:40, 15 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to carry out energy efficiency improvement measures of the state building in Talsu Street 2, Preili, Preili, and the necessary renovation measures, thus improving the thermal stability of the building and having a positive impact on the efficient use of energy resources in Latvia.The project is in the state building, Talsu Street 2, Preili, the construction cadastral designation 7601 004 0302 001, the total area of 2425...)
Jump to navigation Jump to search
Project Q3056986 in Latvia
Language Label Description Also known as
English
No label defined
Project Q3056986 in Latvia

    Statements

    0 references
    0 references
    497,115.46 Euro
    0 references
    584,841.72 Euro
    0 references
    21 August 2020
    0 references
    31 October 2022
    0 references
    Nodrošinājuma valsts aģentūra
    0 references
    0 references

    56°17'27.38"N, 26°43'17.08"E
    0 references
    Projekta mērķis ir veikt valsts ēkas Talsu ielā 2, Preiļos, Preiļu novadā, energoefektivitātes paaugstināšanas un nepieciešamos ēkas atjaunošanas pasākumus, tādējādi uzlabojot ēkas siltumnoturību un pozitīvi ietekmējot energoresursu efektīvu izmantošanu Latvijā.Projekta valsts ēkā, Talsu ielā 2, Preiļos, būves kadastra apzīmējums 7601 004 0302 001, kopējā platība 2425,10 m² (turpmāk – ēka) ir valsts īpašumā, Iekšlietu ministrijas valdījumā. Ēku lieto Valsts policijas Latgales reģiona pārvaldes Preiļu iecirknis, Latvijas Republikas Prokuratūra, Tiesu administrācija un Preiļu novada dome (institūcijas nodrošina valsts pārvaldes funkcijas). Ēkai 2016.gadā tika veikta tehniskā apsekošana un tika konstatētas vairākas problēmas, kuru dēļ ir siltuma enerģijas zudumi un zema ēkas norobežojošo konstrukciju siltuma noturība, līdz ar to, zema energoefektivitāte. Līdz ar to, lai nodrošinātu minēto problēmu efektīvu risināšanu, nepieciešams ieviest šādas energoefektivitātes pasākumu kompleksās aktivitātes: - fasādes sienu siltināšana; cokola siltināšana ēkas daļā ar un bez pagraba; - bēniņu pārseguma siltināšana; - jumta seguma nomaiņa/atjaunošana; - jumta pārseguma siltināšana; - jumta lietusūdens noteksistēmas atjaunošana (tostarp, betona aizsargapmales atjaunošana); - pieslēguma elementu (ārējās kāpņu, uzjumtiņu, utt.) atjaunošana; -esošo logu nomaiņa; - esošo ieejas mezglu nomaiņa. Pēc projekta īstenošanas tiks sagaidāmi projekta galvenie rezultāti: siltumenerģijas patēriņa samazinājums: no 309,312 MWh līdz 130,702 MWh gadā (57,74 % samazinājums) vai no 127,55 kWh/m² gadā līdz 53,91 kWh/m² gadā; primārās enerģijas patēriņa samazinājums: no 461,386 MWh līdz 229,193 MWh gadā (50,32 % samazinājums) vai no 190,25 kWh/m² gadā līdz 94,51 kWh/m² gadā. Primāras enerģijas faktors siltumenerģijai – 1,3 un elektroenerģijai 1,5; oglekļa dioksīda CO2 emisijas samazinājums gadā: no 85,965 tCO2/gadā līdz 38,812 tCO2/gadā (54,85 % samazinājums). CO2 emisijas faktors siltumenerģijai 0,264 tCO2/MWh, elektroenerģijai 0,109 tCO2/MWh.Projekta ieviešanas laiks ir no 2020.gada augusta līdz 2022.gada oktobrim, kopā–27 mēneši. Projekta kopējās attiecināmās izmaksas ir 584 841,72 EUR: 85% ir ERAF finansējums 497 115,46 EUR un 15% ir valsts budžeta līdzekļi 87 726,26 EUR. (Latvian)
    0 references
    The aim of the project is to carry out energy efficiency improvement measures of the state building in Talsu Street 2, Preili, Preili, and the necessary renovation measures, thus improving the thermal stability of the building and having a positive impact on the efficient use of energy resources in Latvia.The project is in the state building, Talsu Street 2, Preili, the construction cadastral designation 7601 004 0302 001, the total area of 2425.10 m² (hereinafter – the building) is owned by the State, Ministry of Interior. The building is used by the State Police of Latgale Region Administration Preili District, the Public Prosecutor’s Office of the Republic of Latvia, Court Administration and Preili Regional Council (institutions provide state administration functions). Technical survey was carried out on the building in 2016 and several problems were identified, which resulted in loss of heat energy and low heat resistance of building envelopes, thus, low energy efficiency. In order to ensure that these challenges are effectively addressed, it is therefore necessary to introduce the following complex actions of energy efficiency measures: — insulation of facade walls; Plinth insulation in the part of the building with and without basement; — insulation of the attic cover; — replacement/renewal of roofing; — insulation of roof covering; — Restoration of the roof rainwater drainage system (including restoration of the concrete defensive coaming); — renewal of connection elements (external staircases, roofs, etc.); — Replacement of existing windows; — replacement of existing entry nodes. The main project results will be expected after the implementation of the project: Reduction in thermal energy consumption: From 309,312 MWh to 130,702 MWh/year (57,74 % reduction) or from 127,55 kWh/m²/year to 53,91 kWh/m²/year; Reduction of primary energy consumption: From 461,386 MWh to 229,193 MWh/year (50,32 % reduction) or from 190,25 kWh/m²/year to 94,51 kWh/m² per year. The primary energy factor for heat: 1,3 and for electricity 1,5; Annual reduction of carbon dioxide CO2 emissions: From 85.965 tCO2/year to 38.812 tCO2/year (54.85 % reduction). CO2 emission factor for heat 0,264 tCO2/MWh, electricity 0,109 tCO2/MWh.Project implementation time is from August 2020 to October 2022, total-27 months. The total eligible costs of the project are EUR 584841,72: 85 % is ERDF funding of EUR 497115.46 and 15 % is state budget of EUR 87726.26. (English)
    15 July 2021
    0 references
    Talsu iela 2, Preiļi, Preiļu nov., LV-5301
    0 references

    Identifiers

    4.2.1.2/19/I/025
    0 references