Closure of Wastewater Sanitation Systems Connection to the Pedrogão Grande Wastewater Treatment Plant (Q2982800)

From EU Knowledge Graph
Revision as of 08:36, 9 July 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2982800 in Portugal
Language Label Description Also known as
English
Closure of Wastewater Sanitation Systems Connection to the Pedrogão Grande Wastewater Treatment Plant
Project Q2982800 in Portugal

    Statements

    0 references
    933,123.92 Euro
    0 references
    85.0 percent
    0 references
    6 January 2020
    0 references
    30 December 2022
    0 references
    APIN - EMPRESA INTERMUNICIPAL DE AMBIENTE DO PINHAL INTERIOR, E.I.M., S.A.
    0 references
    Q3054883 (Deleted Item)
    0 references
    0 references

    39°55'1.06"N, 8°8'44.02"W
    0 references
    A operação consiste na execução de 13242,50 ml de coletores gravíticos, 3 Estações Elevatórias, 1214,98 ml de condutas elevatórias e 163 ramais de ligação, com ligação ao Subsistema de Saneamento de Pedrogão Grande e tratamento final na ETAR de Pedrogão Grande, com descarga do efluente na linha de água localizada nas imediações da referida ETAR. (Portuguese)
    0 references
    The operation consists of the execution of 13242.50 ml of gravitic collectors, 3 Elevatory Stations, 1214.98 ml of lifting ducts and 163 connecting branches, with connection to the Pedrogão Grande Sanitation Subsystem and final treatment in the treatment plant of Pedrogão Grande, with discharge of the effluent into the water line located in the vicinity of the said treatment plant. (English)
    9 July 2021
    0 references
    Pedrógão Grande, Pedrógão Grande
    0 references

    Identifiers

    POSEUR-03-2012-FC-001220
    0 references