Closing down water supply systems in the municipality of Oliveira de Azeméis – 1st phase (Q2982450)
Jump to navigation
Jump to search
Project Q2982450 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Closing down water supply systems in the municipality of Oliveira de Azeméis – 1st phase |
Project Q2982450 in Portugal |
Statements
1,265,581.86 Euro
0 references
85.0 percent
0 references
30 January 2018
0 references
31 March 2021
0 references
MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
0 references
Q3000779 (Deleted Item)
0 references
Pretende-se executar o fecho dos sistemas de abastecimento: na Vila de Cucujães nos lugares de São Fôjo, Fonte Escura, Ínsua e Santa Luzia, através do prolongamento da rede de abastecimento de água a partir de R7 e em Travanca a partir do R24. As redes que constituem o projeto de intervenção têm a mesma origem (Albufeira de Crestuma-Lever tratamento na ETA do Lever). (Portuguese)
0 references
It is intended to implement the closure of the supply systems: In the village of Cucujães in the places of São Fôjo, Fonte Escura, Ínsua and Santa Luzia, through the extension of the water supply network from R7 and Travanca from the R24. The networks that constitute the intervention project have the same origin (Albufeira de Crestuma-Lever treatment at ETA do Lever). (English)
9 July 2021
0 references
Oliveira de Azeméis