Disassociating Albufeira do Açude-Ponte de Coimbra and Stabilisation of the right bank of the Mondego River between the Santa Clara Bridge and the Dam – Coimbra Bridge (Q2981671)

From EU Knowledge Graph
Revision as of 02:08, 9 July 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The operation is composed of the project "Disassor. da Albufeira do Açude-Ponte de Coimbra" which has as its object the removal of sediments from Albufeira do Açude and the "Estabiliz. of the right bank of the Mond. between Pte Sta. Clara e o Açude – Ponte de Coimbra" the stability of the containment structures on the right bank, as well as the respective inspection services., remove_old_english_translation)
Jump to navigation Jump to search
Project Q2981671 in Portugal
Language Label Description Also known as
English
Disassociating Albufeira do Açude-Ponte de Coimbra and Stabilisation of the right bank of the Mondego River between the Santa Clara Bridge and the Dam – Coimbra Bridge
Project Q2981671 in Portugal

    Statements

    0 references
    10,177,997.1 Euro
    0 references
    85.0 percent
    0 references
    16 July 2015
    0 references
    30 September 2022
    0 references
    MUNICÍPIO DE COIMBRA
    0 references
    0 references

    40°12'32.08"N, 8°25'55.24"W
    0 references
    A operação é composta pela empreitada "Desassor. da Albufeira do Açude-Ponte de Coimbra" que tem por objeto a retirada de sedimentos da Albufeira do Açude e a "Estabiliz. da margem direita do Rio Mond. entre a Pte Sta. Clara e o Açude - Ponte de Coimbra" a estabiliz. das estruturas de contenção da margem direita, bem como os respetivos serviços de fiscalização. (Portuguese)
    0 references
    Coimbra, União das freguesias de Coimbra (Sé Nova, Santa Cruz, Almedina e São Bartolomeu)
    0 references

    Identifiers

    POSEUR-02-1810-FC-000380
    0 references