No label defined (Q2982957)

From EU Knowledge Graph
Revision as of 02:06, 9 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %., translated_summary)
Jump to navigation Jump to search
Project Q2982957 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982957 in Portugal

    Statements

    0 references
    1,357,642.89 Euro
    0 references
    85.0 percent
    0 references
    30 June 2021
    0 references
    29 June 2023
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    0 references

    40°50'20.44"N, 8°28'40.01"W
    0 references
    A operação visa o prolongamento da rede de drenagem de águas residuais a populações ainda não servidas em determinadas zonas de intervenção do Município de Oliveira de Azeméis, nomeadamente, Fajões, Oliveira de Azeméis, Santiago de Riba-Ul e Madail. A concretização da operação permitirá chegar a mais 2 883 habitantes o que se traduz num aumento de taxa de cobertura na ordem dos 4,07%. (Portuguese)
    0 references
    The operation aims to extend the drainage network of waste water to populations not yet served in certain intervention areas of the municipality of Oliveira de Azeméis, namely Fajões, Oliveira de Azeméis, Santiago de Riba-Ul and Madail. The implementation of the operation will make it possible to reach a further 2 883 inhabitants, resulting in an increase in the coverage rate of 4.07 %. (English)
    9 July 2021
    0 references
    Oliveira de Azeméis
    0 references

    Identifiers

    POSEUR-03-2012-FC-001453
    0 references