Expansion of the water supply system of Campo Redondo – Foros dos Vales e Caeiros da Fontinha (Q2982526)

From EU Knowledge Graph
Revision as of 01:58, 9 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2982526 in Portugal
Language Label Description Also known as
English
Expansion of the water supply system of Campo Redondo – Foros dos Vales e Caeiros da Fontinha
Project Q2982526 in Portugal

    Statements

    0 references
    220,223.88 Euro
    0 references
    85.0 percent
    0 references
    20 March 2018
    0 references
    30 January 2019
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references
    0 references

    37°35'51.36"N, 8°38'31.92"W
    0 references
    A obra a efetuar consta da construção de um conjunto de condutas de distribuição que ligarão o sistema de abastecimento de água da localidade de Campo Redondo aos lugares de Foros dos Vales e Caeiros da Fontinha e dos ramais de abastecimento para ligar as habitações à rede. (Portuguese)
    0 references
    The work to be carried out consists of the construction of a set of distribution pipelines that will connect the water supply system of the locality of Campo Redondo to the places of Foros dos Vales and Caeiros da Fontinha and the supply branches to connect the dwellings to the network. (English)
    9 July 2021
    0 references
    Odemira
    0 references

    Identifiers

    POSEUR-03-2012-FC-000755
    0 references