No label defined (Q2982450)

From EU Knowledge Graph
Revision as of 01:51, 9 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): It is intended to implement the closure of the supply systems: In the village of Cucujães in the places of São Fôjo, Fonte Escura, Ínsua and Santa Luzia, through the extension of the water supply network from R7 and Travanca from the R24. The networks that constitute the intervention project have the same origin (Albufeira de Crestuma-Lever treatment at ETA do Lever)., translated_summary)
Jump to navigation Jump to search
Project Q2982450 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982450 in Portugal

    Statements

    0 references
    1,265,581.86 Euro
    0 references
    85.0 percent
    0 references
    30 January 2018
    0 references
    31 March 2021
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    0 references

    40°50'20.44"N, 8°28'40.01"W
    0 references
    Pretende-se executar o fecho dos sistemas de abastecimento: na Vila de Cucujães nos lugares de São Fôjo, Fonte Escura, Ínsua e Santa Luzia, através do prolongamento da rede de abastecimento de água a partir de R7 e em Travanca a partir do R24. As redes que constituem o projeto de intervenção têm a mesma origem (Albufeira de Crestuma-Lever – tratamento na ETA do Lever). (Portuguese)
    0 references
    It is intended to implement the closure of the supply systems: In the village of Cucujães in the places of São Fôjo, Fonte Escura, Ínsua and Santa Luzia, through the extension of the water supply network from R7 and Travanca from the R24. The networks that constitute the intervention project have the same origin (Albufeira de Crestuma-Lever treatment at ETA do Lever). (English)
    9 July 2021
    0 references
    Oliveira de Azeméis
    0 references

    Identifiers

    POSEUR-03-2012-FC-000641
    0 references