Energy efficiency in the Pharmaceutical Sciences building of the University of Beira Interior (Q2981172)

From EU Knowledge Graph
Revision as of 01:31, 9 July 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The aim is to implement insulation of the interior cover, replace the chiller, intervene in lighting, install a monitoring system for electricity and gas consumption and a photovoltaic system for the production of electrical energy for self-consumption. The expected results are the reduction and monitoring of energy costs, primary energy and the reduction of greenhouse gas emissions., remove_old_english_translation)
Jump to navigation Jump to search
Project Q2981172 in Portugal
Language Label Description Also known as
English
Energy efficiency in the Pharmaceutical Sciences building of the University of Beira Interior
Project Q2981172 in Portugal

    Statements

    0 references
    39,754.61 Euro
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    30 May 2020
    0 references
    UNIVERSIDADE DA BEIRA INTERIOR
    0 references
    0 references

    40°16'46.88"N, 7°30'17.53"W
    0 references
    Pretendem-se implementar o isolamento da cobertura interior, substituir o chiller, intervencionar a iluminação, instalar um sistema de monitorização de consumos de eletricidade e gás e um sistema fotovoltaico de produção de energia elétrica para autoconsumo. Os resultados esperados são a redução e monitorização dos custos energéticos, da energia primária e a redução da emissão de gases com efeito de estufa. (Portuguese)
    0 references
    Covilhã, União das freguesias de Covilhã e Canhoso
    0 references

    Identifiers

    POSEUR-01-1203-FC-000049
    0 references