UPGRADING OF URBAN STREETS – WEST ZONE – STREET EMÍDIO NAVARRO (Q2895257)

From EU Knowledge Graph
Revision as of 07:15, 8 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of this project is to standardise the urban environment of that area in terms of the typology of floors, urban equipment and public lighting and at the same time to modernise installed infrastructures such as rainwater drainage networks, sewage drainage networks and water supply networks., translated_summary)
Jump to navigation Jump to search
Project Q2895257 in Portugal
Language Label Description Also known as
English
UPGRADING OF URBAN STREETS – WEST ZONE – STREET EMÍDIO NAVARRO
Project Q2895257 in Portugal

    Statements

    0 references
    195,916.4 Euro
    0 references
    85.0 percent
    0 references
    1 March 2019
    0 references
    30 June 2021
    0 references
    MUNICIPIO DE CASTELO DE PAIVA
    0 references

    41°2'27.60"N, 8°16'18.41"W
    0 references
    Pretende-se com este projeto, uniformizar o ambiente urbano daquela zona no que a tipologia de pavimentos, equipamento urbano e iluminação pública e ao mesmo tempo modernizar infraestruras instaladas tais como redes de drenagem de águas pluviais, redes de drenagem de águas residuais e redes de abastecimento de água. (Portuguese)
    0 references
    The aim of this project is to standardise the urban environment of that area in terms of the typology of floors, urban equipment and public lighting and at the same time to modernise installed infrastructures such as rainwater drainage networks, sewage drainage networks and water supply networks. (English)
    8 July 2021
    0 references
    Castelo de Paiva
    0 references

    Identifiers

    NORTE-04-2316-FEDER-000328
    0 references