Energy requalification of the Municipal Pools of Moncorvo Tower (Q2894585)

From EU Knowledge Graph
Revision as of 07:00, 8 July 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The intervention is characterised by the replacement of pool pumps by more efficient pumps adaptation of existing roofing mechanisms of the water planes of the two Pool tanks, in order to enable their daily uses thermal insulation application in heat exchangers replacement of lighting by LED lamps installation of photovoltaic system for self-consumption and installation of Technical Management System., remove_old_english_translation)
Jump to navigation Jump to search
Project Q2894585 in Portugal
Language Label Description Also known as
English
Energy requalification of the Municipal Pools of Moncorvo Tower
Project Q2894585 in Portugal

    Statements

    0 references
    53,077.81 Euro
    0 references
    85.0 percent
    0 references
    1 November 2018
    0 references
    31 December 2020
    0 references
    MUNICIPIO DE TORRE DE MONCORVO
    0 references

    41°10'58.87"N, 7°3'44.89"W
    0 references
    A intervenção caracteriza-se pela substituição das bombas das piscinas por bombas mais eficientes adaptação dos mecanismos de coberturas existentes dos planos de água dos dois tanques da Piscina, de modo a viabilizar as suas utilizações diárias aplicação de isolamento térmico nos permutadores de calor substituição da iluminação por luminárias LED instalação de sistema fotovoltaico para autoconsumo e instalação de Sistema de Gestão Técnica. (Portuguese)
    0 references
    Torre de Moncorvo, Torre de Moncorvo
    0 references

    Identifiers

    NORTE-03-1203-FEDER-000365
    0 references