No label defined (Q2719002)

From EU Knowledge Graph
Revision as of 02:32, 8 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is the modernisation of two historic buildings (included in the municipal register of monuments), i.e. the building of the former forge and the building of the former house, will be adapted to the “Talents’ Kuźnia”. The former forge will be prepared to conduct craft workshops (sculptural workshops, pottery workshops, wicker shops, etc.). The building will be rebuilt, renovated and equipped with the necessary furniture,...)
Jump to navigation Jump to search
Project Q2719002 in Poland
Language Label Description Also known as
English
No label defined
Project Q2719002 in Poland

    Statements

    0 references
    337,285.27 zloty
    0 references
    74,978.52 Euro
    0.2223 Euro
    0 references
    518,900.44 zloty
    0 references
    115,351.57 Euro
    0.2223 Euro
    0 references
    65.0 percent
    0 references
    1 October 2019
    0 references
    30 September 2020
    0 references
    GMINA MORYŃ
    0 references
    0 references

    52°51'20.9"N, 14°23'48.5"E
    0 references
    Przedmiotem projektu jest modernizacja dwóch zabytkowych obiekty (wpisanych do gminnej ewidencji zabytków) tj. budynek dawnej kuźni oraz budynek dawnej remizy, zostaną zaadaptowane na „Kuźnię Talentów”. Dawna kuźnia zostanie przygotowana do prowadzenia warsztatów rzemieślniczych (warsztaty rzeźbiarskie, garncarskie, wikliniarskie itp.. Budynek zostanie przebudowany, wyremontowany oraz wyposażony w niezbędne meble, maszyny i narzędzia. Dawna remiza zostanie zaadaptowana na magazyn oraz izbę tradycji z częścią przeznaczoną na ekspozycję prac wykonanych w ramach warsztatów. W izbie tradycji gromadzone będzie zabytkowe wyposażenie gospodarstw domowych. Prace związane z zagospodarowaniem terenu przy obiektach zostaną wykonane przez mieszkańców obszaru objętego rewitalizacją. Mieszkańcy przygotują również ekspozycję w izbie tradycji. Do zakresu rzeczowego projektu należą: 1. Dokumentacja projektowo-kosztorysowa; 2. Roboty budowlane; 3. Inspektor nadzoru budowlanego; 4. Promocja projektu; 5. Wyposażenie i umeblowanie. 6. Studium wykonalności. Wnioskodawcą, inwestorem będzie Gmina Moryń, która zadania w projekcie będzie wykonywać przy pomocy Urzędu Miejskiego w Moryniu. Projekt będzie realizowany jednoetapowo w okresie III kw. 2019-III kw. 2020 i obejmować będzie wyłonienie w drodze przetargu wykonawcy prac budowlanych i roboty budowlane. Nad realizacją projektu będzie czuwać inspektor nadzoru. Najważniejsze etapy prac nad projektem: a) prace przygotowawcze â?? opracowanie dokumentacji technicznej, pozyskanie niezbędnych decyzji, studium wykonalności, przetarg na wyłonienie wykonawcy prac; b)realizacja projektu - roboty budowlane i zakup wyposażenia; c) zakończenie realizacji i odbiór inwestycji protokołem odbioru końcowego robót, rozliczenie inwestycji i promocja. (Polish)
    0 references
    The object of the project is the modernisation of two historic buildings (included in the municipal register of monuments), i.e. the building of the former forge and the building of the former house, will be adapted to the “Talents’ Kuźnia”. The former forge will be prepared to conduct craft workshops (sculptural workshops, pottery workshops, wicker shops, etc.). The building will be rebuilt, renovated and equipped with the necessary furniture, machinery and tools. The former house will be adapted to the magazine and the Chamber of Traditions with a part dedicated to the exhibition of works carried out as part of the workshops. Historical household equipment will be collected in the chamber of tradition. Land management works at the facilities will be carried out by residents of the revitalised area. Residents will also prepare an exhibition in the chamber of tradition. The material scope of the project is: 1. Project and financial documentation; 2. Construction works; 3. Construction supervision inspector; 4. Promotion of the project; 5. Equipment and furnishings. 6. Feasibility study. The applicant and the investor will be the Municipality of Moryń, which will carry out tasks in the project with the help of the Municipal Office in Moryń. The project will be implemented in one step in the third quarter. 2019-Q3 2020 and will include the selection by tender of the contractor for construction works and works. The implementation of the project will be supervised by the supervisory inspector. The main stages of the project are: a) preparatory work – preparation of technical documentation, obtaining the necessary decisions, feasibility study, tender for the selection of the contractor of the works; B)implementation of the project – construction works and purchase of equipment; C) completion and acceptance of the investment by means of the final acceptance of works, settlement of the investment and promotion. (English)
    8 July 2021
    0 references

    Identifiers

    RPZP.09.03.00-32-0037/19
    0 references