Thermomodernisation of single-family buildings in Wolin municipality (Q2718745)

From EU Knowledge Graph
Revision as of 02:24, 8 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2718745 in Poland
Language Label Description Also known as
English
Thermomodernisation of single-family buildings in Wolin municipality
Project Q2718745 in Poland

    Statements

    0 references
    2,033,250.0 zloty
    0 references
    451,991.47 Euro
    0.2223 Euro
    0 references
    2,259,750.0 zloty
    0 references
    502,342.42 Euro
    0.2223 Euro
    0 references
    89.98 percent
    0 references
    2 March 2020
    0 references
    30 June 2022
    0 references
    GMINA WOLIN
    0 references
    0 references

    53°54'47.5"N, 14°31'12.0"E
    0 references
    [ZAKRES RZECZOWY]. Przedmiotowy projekt realizowany będzie w okresie 02.03.2020 - 30.06.2022. Projekt obejmuje swoim zakresem następujące zadania: - zadanie nr 1: Granty na termomodernizację budynków jednorodzinnych - zadanie nr 2: Audyty energetyczne, - zadanie nr 3: Koszty pośrednie. W ramach zadania nr 1 Wnioskodawca przekaże 50 grantów na termomodernizację budynków jednorodzinnych wraz z wymianą indywidualnych źródeł ciepła (starych kotłów, pieców, urządzeń grzewczych oraz realizację przyłączy do sieci ciepłowniczej) na mniej emisyjne na terenie gminy Wolin. Grantobiorcami będą osoby fizyczne legitymujące się tytułem prawnym do nieruchomości, wynikającym z prawa własności, prawa użytkowania wieczystego, ograniczonego prawa rzeczowego lub stosunku zobowiązaniowego. Sposób realizacji programu grantowego został określony w załączniku nr 21 "Projekt regulaminu przyznawania grantu". W wyniku likwidacji źródeł ciepła opartych o spalanie węgla nastąpi podłączenie do istniejącej sieci ciepłowniczej lub zastąpienie zlikwidowanego źródła ciepła nową jednostką wytwarzania energii cieplnej (w pierwszej kolejności na jednostkę wytwarzającą energię ze spalania gazu. Przeprowadzenie wymiany pieca w ramach projektu będzie możliwe wyłącznie kiedy budynek będzie spełniać minimalne wymogi w zakresie efektywności energetycznej tj. 150kWh/(m2xrok). Grant może dotyczyć wyłącznie budynków, w których nie jest prowadzona działalność gospodarcza. W ramach zadania nr 2 przewidziano wykonanie 60 audytów energetycznych budynków, które zostaną zgłoszone do projektu. [SPOSÓB WDRAŻANIA]. Projekt będzie wdrażany przez Gminę Wolin. Opis sposobu zarządzania projektem przedstawiono w punkcie 1.3 Planu realizacji projektu. [CHARAKTER I ETAPY PROJEKTU]. Projekt ma charakter stacjonarny i nie jest podzielony na etapy. (Polish)
    0 references
    [SUBSTANTIVE SCOPE]. The project will be implemented in the period 02.03.2020-30.06.2022. The project shall cover the following tasks: — task 1: Grants for thermomodernisation of single-family buildings – Task 2: Energy audits – Task 3: Indirect costs. As part of Task 1, the Applicant will provide 50 grants for thermomodernisation of single-family buildings together with the replacement of individual heat sources (old boilers, stoves, heating appliances and the implementation of connections to the district heating network) for less emissions in the municipality of Wolin. The grantees will be natural persons holding legal title to real estate, resulting from ownership, perpetual usufruct, limited right in rem or debt relationship. The method of implementation of the grant programme is set out in Annex 21 “Draft rules for awarding the grant”. As a result of the decommissioning of coal-fired heat sources, there will be a connection to an existing district heating network or a replacement of the decommissioned heat source with a new heat generation unit (in the first instance, a unit producing electricity from the combustion of gas. The replacement of the kiln within the project will only be possible if the building meets minimum energy efficiency requirements, i.e. 150 kWh/(m2xyear). Grant may only concern buildings in which no economic activity is carried out. Task 2 foresees 60 energy audits of buildings to be submitted for the project. [MODE OF IMPLEMENTATION]. The project will be implemented by Wolin Municipality. A description of how the project is managed is set out in point 1.3 of the Project Implementation Plan. [NATURE AND STAGES OF THE PROJECT]. The project is stationary and is not divided into stages. (English)
    8 July 2021
    0 references

    Identifiers

    RPZP.02.15.00-32-A017/19
    0 references