Increasing the potential of the energy grid ENEA Operator Sp. z o.o. in order to receive energy from renewable sources in the Zachodniopomorskie Voivodeship (Q2718707)

From EU Knowledge Graph
Revision as of 02:23, 8 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2718707 in Poland
Language Label Description Also known as
English
Increasing the potential of the energy grid ENEA Operator Sp. z o.o. in order to receive energy from renewable sources in the Zachodniopomorskie Voivodeship
Project Q2718707 in Poland

    Statements

    0 references
    3,972,512.01 zloty
    0 references
    883,089.42 Euro
    0.2223 Euro
    0 references
    10,600,000.0 zloty
    0 references
    2,356,380.0 Euro
    0.2223 Euro
    0 references
    37.48 percent
    0 references
    1 October 2020
    0 references
    31 December 2023
    0 references
    ENEA OPERATOR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    53°8'44.5"N, 14°53'33.7"E
    0 references
    Zakres projektu obejmuje przebudowę stacji elektroenergetycznej WN/SN Pyrzyce. Stacja zlokalizowana jest na terenie o zidentyfikowanym zapotrzebowaniu na nowe moce przyłączeniowe w związku z produkcją OZE - identyfikacji zapotrzebowania dokonano na etapie opracowania Planu Gospodarki Niskoemisyjnej dla gminy Pyrzyce na lata 2015-2020. Projekt realizowany jest w formule „zaprojektuj i wybuduj” zgodnie z którą to na wyłonionym wykonawcy spoczywać będzie także pozyskanie wymaganych decyzji administracyjnych i zgód formalno-prawnych umożliwiających realizację inwestycji. Wyłonienie Wykonawcy zamówienia, odbędzie się zgodnie z przepisami Prawa Zamówień Publicznych oraz wewnętrznym dokumentem „Regulamin udzielania zamówień przez ENEA Operator Sp. z o.o. współfinansowanych ze środków Unii Europejskiej”. Nadzór inwestorski będzie prowadzony siłami własnymi ENEA Operator Sp. z o.o. Planowany zakres prac obejmuje następujące elementy: dokumentacja techniczna, wymiana rozdzielnicy SN na nową wraz z zabezpieczeniami i obwodami wtórnymi rozdzielni 15 kV, wymiana transformatorów WN/SN wraz z mostami kablowymi i zabezpieczeniami 110 kV, zabudowa nowych mostów kablowych łączących transformatory WN/SN z rozdzielnicą SN, przebudowa wyprowadzeń linii SN do nowej rozdzielni, modernizacja zespołu uziemiającego nr 2, modernizacja rozdzielni potrzeb własnych prądu stałego i przemiennego, wymiana baterii akumulatorów, modernizacja systemu telemechaniki, doposażenie istniejącego systemu łączności, modernizacja BKR1 i BKR2, zabudowa systemu SOT, modernizacja budynku stacji, zagospodarowanie terenu wokół stacji wraz z ogrodzeniem. W kosztach projektu uwzględniono koszt wykonania tablic informacyjnych i pamiątkowych. Koszt ten nie będzie zwiększał wartości środków trwałych wytworzonych w ramach projektu. Będzie wykazywany w pozostałych kosztach operacyjnych. W wyniku realizacji projektu nastąpi wzrost potencjalnej mocy generacji rozproszonej możliwej do przyłączenia w wysokości 8 MW. (Polish)
    0 references
    The scope of the project includes the reconstruction of the WN/SN Pyrzyce power station. The station is located in an area with identified demand for new connection capacities in connection with RES production – the identification of the demand was made at the stage of drawing up the Low Emission Management Plan for the Municipality of Pyrzyce for the years 2015-2020. The project is implemented in the formula “design and build” according to which the selected contractor will also be required to obtain the required administrative decisions and formal and legal consents enabling the implementation of the investment. The selection of the Contractor of the contract will be carried out in accordance with the provisions of the Public Procurement Law and the internal document “Regulations for the award of contracts by ENEA Operator Sp. z o.o. co-financed by the European Union”. Investor supervision will be carried out by own forces of ENEA Operator Sp. z o.o. The planned scope of work includes the following elements: technical documentation, replacement of SN switchgear with new switchgear with security and secondary circuits of 15 kV switchgear, replacement of WN/SN transformers with cable bridges and 110 kV protections, installation of new cable bridges connecting WN/SN transformers with SN switchgear, reconstruction of the outputs of the SN line to the new switchboard, modernisation of grounding unit No. 2, modernisation of the switchboard needs of own DC and AC, replacement of battery batteries, modernisation of the telemechanics system, retrofitting of the existing communication system, modernisation of BKR1 and BKR2, construction of the SOT system, modernisation of the station building, land development around the station and fence. The cost of producing information and commemorative boards was included in the project costs. This cost will not increase the value of the fixed assets generated by the project. It will be shown in the remaining operating costs. The project will result in an increase in the potential distributed generation capacity that can be connected to 8 MW. (English)
    8 July 2021
    0 references

    Identifiers

    RPZP.02.11.00-32-C001/19
    0 references