Extension of provincial road No 527 on the Łukta-Olsztyn section (Q2717397)

From EU Knowledge Graph
Revision as of 01:57, 8 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2717397 in Poland
Language Label Description Also known as
English
Extension of provincial road No 527 on the Łukta-Olsztyn section
Project Q2717397 in Poland

    Statements

    0 references
    0 references
    0 references
    140,161,856.17 zloty
    0 references
    31,157,980.63 Euro
    0.2223 Euro
    0 references
    165,008,501.91 zloty
    0 references
    36,681,389.97 Euro
    0.2223 Euro
    0 references
    84.94 percent
    0 references
    19 January 2016
    0 references
    31 March 2023
    0 references
    WOJEWÓDZTWO WARMIŃSKO-MAZURSKIE
    0 references
    0 references

    53°49'39.4"N, 20°18'37.8"E
    0 references

    53°48'17.6"N, 20°5'2.4"E
    0 references
    Przedsięwzięcie dotyczy rozbudowy drogi wojewódzkiej nr 527 na odcinku Łukta – Olsztyn o łącznej długości 21,65 km na terenie gmin Łukta i Jonkowo, w powiecie ostródzkim i olsztyńskim, województwo warmińsko – mazurskie. Zakres prac w podziale na działania obejmuje zakres kwalifikowalny: prace przyg. (dok. projektowa), nadzór w projekcie (Inżynier Kontraktu, nadzór autorski), promocja projektu, zakup nieruchomości, roboty bud. (rozbudowa drogi zapewniająca przeniesienie obciążeń o nacisku 115 kN/oś, rozbudowa i przebudowa skrzyżowań, dróg krzyżujących się, przebudowa lub budowa chodników i ścieżek rowerowych, zjazdów, miejsc postojowych, zatok aut., przejść dla pieszych, przepustów, odwodnienia, przebud. kolidującej infrastruktury technicznej, obiektów inżynierskich, wycinka drzew kolidujących zagospodarowanie zieleni. Projekt wpisuje się w SzOOP RPO WiM 2014-2020 działanie 7.1. Infrastruktura drogowa o znaczeniu regionalnym – projekty pozakonkursowe Województwa Warm.-Maz. Realizuje cel temat.7,priorytet inwest.7b. Zwiększanie mobilności regionalnej poprzez łączenie węzłów drugorzędnych i trzeciorzędnych z infrastrukturą TEN-T, w tym z węzłami multimodalnymi oraz cel szczegółowy działania. DW 527 zapewnia lepsze skomunikowanie stolicy województwa warmińsko-mazurskiego i jego obszaru funkcjonalnego z nadrzędnymi drogami zarówno bazowej jaki i kompleksowej sieci TEN –T. Co realizowane jest poprzez połączenie z drogą S7 oraz odcinkiem miejskim prowadzącym do węzła „Południe”, a także za pośrednictwem połączenia z DK16 (w ciągu dróg trzeciorzędnych ulic: Gościnnej, Kresowej, Wołodyjowskiego, Żurawiej, Perkoza w Olsztynie, wraz z odcinkiem drogi w gminie Gietrzwałd) do węzła Olsztyn Zachód” w ciągu obwodnicy Olsztyna (S51). Projekt w istotny sposób usprawni zatem przejazd w kierunku sieci TEN-T, wykorzystując potencjał zrealizowanych już inwestycji drogowych komplem.., tym samym poprawi dostępność województwa, obsługiwać będzie zarówno ruch tranzytowy jak i lokalny. (Polish)
    0 references
    The project concerns the extension of voivodship road No 527 on the section Łukta – Olsztyn with a total length of 21.65 km in the municipalities of Łukta and Jonkowo, in the districts of Ostródzki and Olsztyn, and the Warmińsko-Mazurskie Voivodeship. The scope of the work by measure covers the eligible scope: work of nails. (design document), project supervision (Contract engineer, author’s supervision), project promotion, purchase of real estate, construction works. (expansion of the road ensuring the transfer of loads with a load of 115 kN/axle, extension and reconstruction of intersections, crossing roads, reconstruction or construction of pavements and bicycle paths, downhills, parking spaces, car bays, pedestrian crossings, culverts, drainage, reconstruction of conflicting technical infrastructure, engineering structures, felling trees that interfere with the development of greenery. The project is part of the SzOOP ROP WiM 2014-2020 Action 7.1. Road infrastructure of regional importance – non-competition projects of Warm.-Maz. Pursues the objective of the theme.7,priority of investment.7b. Enhancing regional mobility by connecting secondary and tertiary nodes to TEN-T infrastructure, including multimodal nodes and specific objective of the action. DW 527 ensures better communication between the capital of Warmińsko-Mazurskie and its functional area with the overarching roads of both the base and the comprehensive TEN-T network. What is accomplished through the connection to the S7 road and the urban section leading to the South junction, as well as the connection to DK16 (within the tertiary roads of the streets: Hospitable, Kresowa, Wołodyjowski, Żurawiej, Perkoza in Olsztyn, together with a section of the road in the municipality of Gietrzwałd) to the Olsztyn Zawest junction" within the Olsztyn ring road (S51). The project will therefore significantly improve the journey towards the TEN-T network, exploiting the potential of the already completed road investments, thereby improving the accessibility of the region, serving both transit and local traffic. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.07.01.00-28-0001/20
    0 references