Replacement of street lighting poles and luminaires for energy-efficient lighting on key streets of Lędzin – stage II (Q2713364)

From EU Knowledge Graph
Revision as of 23:35, 7 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2713364 in Poland
Language Label Description Also known as
English
Replacement of street lighting poles and luminaires for energy-efficient lighting on key streets of Lędzin – stage II
Project Q2713364 in Poland

    Statements

    0 references
    0 references
    339,970.82 zloty
    0 references
    75,575.51 Euro
    0.2223 Euro
    0 references
    399,965.66 zloty
    0 references
    88,912.37 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    19 August 2018
    0 references
    31 December 2021
    0 references
    GMINA LĘDZINY
    0 references
    0 references

    50°7'43.0"N, 19°6'58.0"E
    0 references
    Realizacja zadania polegać będzie na demontażu 364 opraw starego typu i montażu 334 opraw typu LED o mocach od 24 do 72W w 16 lokalizacjach na terenie Lędzin. Sumaryczna moc czynna oświetlenia zostanie zredukowana z 54,69 kW do 20,11 kW. Z kolei moc bierna zostanie obniżona z 7,46 do 0,60 kvar. Nowe oprawy będą charakteryzować się sprawnością na poziomie 95-97%. Na skutek przeprowadzenia zaplanowanych prac nastąpi wzrost efektywności energetycznej oświetlenia ulicznego na przedmiotowych odcinkach, co ograniczy produkcję CO2 oraz PM10 na terenie Gminy Lędziny i zmniejszy problem niskiej emisji. Pod względem formalno-prawnym projekt jest gotowy do realizacji. (Polish)
    0 references
    The task will be done by dismantling 364 old-type luminaires and installing 334 LED luminaires with power from 24 to 72 W in 16 locations in Lędzin area. The total active illumination power will be reduced from 54.69 kW to 20.11 kW. In turn, the reactive power will be reduced from 7.46 to 0.60 kvar. The new luminaires will have a 95-97 % efficiency. As a result of the planned works, there will be an increase in the energy efficiency of street lighting in the sections concerned, which will reduce the production of CO2 and PM10 in the Lędzina Municipality and reduce the problem of low emissions. Formally and legally, the project is ready for implementation. (English)
    8 July 2021
    0 references

    Identifiers

    RPSL.04.05.01-24-020F/20
    0 references