No label defined (Q2711425)

From EU Knowledge Graph
Revision as of 22:46, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project concerns the installation of solar collectors for the needs of residents of the Municipality of Nowe Piekuty. The project has two objectives: quantified direct and social, economic and environmental objectives (difficult to quantify). The direct objectives of the project are: improvement of technical infrastructure, increase of energy production from RES, reduction of CO2 emissions, increased share of distributed energy production fr...)
Jump to navigation Jump to search
Project Q2711425 in Poland
Language Label Description Also known as
English
No label defined
Project Q2711425 in Poland

    Statements

    0 references
    283,655.52 zloty
    0 references
    63,056.62 Euro
    0.2223 Euro
    0 references
    354,569.4 zloty
    0 references
    78,820.78 Euro
    0.2223 Euro
    0 references
    80.0 percent
    0 references
    19 November 2020
    0 references
    29 April 2022
    0 references
    GMINA NOWE PIEKUTY
    0 references

    52°51'18.7"N, 22°42'24.1"E
    0 references
    Projekt dotyczy montażu instalacji kolektorów słonecznych na potrzeby mieszkańców Gminy Nowe Piekuty. Projekt posiada dwie grupy celów: kwantyfikowane cele bezpośrednie i cele o wymiarze społecznym, gospodarczym i środowiskowym (trudne do kwantyfikacji). Celami bezpośrednimi projektu są: poprawa infrastr. technicznej, wzrost produkcji energii z OZE, redukcja emisji CO2, zwiększony udział rozproszonej produkcji energii z OZE. Do celów społecznych, gospodarczych i środowiskowych należą: podniesienie jakości życia mieszkańców poprzez wzrost jakości infrastruktury technicznej, ochrona środowiska w wyniku redukcji zanieczyszczeń do atmosfery, redukcja kosztów opłat za energię i wzrost dochodu do dyspozycji. Projekt obejmuje: Zadanie 1. Montaż 25 sztuk. instalacji kolektorów słonecznych. Zadanie 2. Nadzór inwestorski Beneficjentem Projektu i Wnioskodawcą jest Gmina Nowe Piekuty. Beneficjenci ostateczni projektu (Grantobiorcy) to mieszkańcy gminy. Beneficjentami ostatecznymi projektu są także inni mieszkańcy (nie Grantobiorcy), którzy będą korzystać z lepszej jakości powietrza dzięki redukcji emisji CO2 i innych zanieczyszczeń. Wskaźniki projektu: - Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 25 szt. - Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych – 0,07 MW. - Szacowany roczny spadek emisji gazów cieplarnianych – 16,83 Mg. - Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE – 49,5 MWh/rok. Projekt będzie realizowany w oparciu o regulamin naboru i realizacji projektu grantowego stanowiącego załącznik do wniosku o dofinansowanie. (Polish)
    0 references
    The project concerns the installation of solar collectors for the needs of residents of the Municipality of Nowe Piekuty. The project has two objectives: quantified direct and social, economic and environmental objectives (difficult to quantify). The direct objectives of the project are: improvement of technical infrastructure, increase of energy production from RES, reduction of CO2 emissions, increased share of distributed energy production from RES. Social, economic and environmental objectives include: improving the quality of life of residents by increasing the quality of technical infrastructure, protecting the environment as a result of reducing pollution into the atmosphere, reducing the cost of energy charges and increasing disposable income. The project includes: Activity 1. Installation of 25 pieces. solar collectors installation. Task 2. Investor supervision The beneficiary of the Project and the Applicant is the Municipality of Nowe Piekuty. The final beneficiaries of the project (Granto recipients) are residents of the municipality. The final beneficiaries of the project are also other residents (not Grantees) who will benefit from better air quality by reducing CO2 and other pollutants. Project indicators: — Number of RES heat generation units built – 25 pcs. — Additional renewable energy generation capacity – 0.07 MW. — Estimated annual decrease in greenhouse gas emissions – 16.83 Mg. — Production of thermal energy from newly built RES installations – 49.5 MWh/year. The project will be implemented on the basis of the rules governing the recruitment and implementation of the grant project annexed to the application for funding. (English)
    8 July 2021
    0 references

    Identifiers

    RPPD.08.06.00-20-0451/20
    0 references