No label defined (Q2709707)

From EU Knowledge Graph
Revision as of 22:02, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The subject of the project is the purchase of specialised medical equipment necessary for the treatment of civilisation diseases caused by cardiovascular diseases to the unit of systemic rehabilitation with neurological sub-unit and physiotherapy department, as well as the reconstruction of the branch located on the ground floor of the building – Pavilion “B” in terms of adapting parts of each of the 5 rooms to a bathroom with toilet, rebuilding...)
Jump to navigation Jump to search
Project Q2709707 in Poland
Language Label Description Also known as
English
No label defined
Project Q2709707 in Poland

    Statements

    0 references
    0 references
    961,560.29 zloty
    0 references
    213,754.85 Euro
    0.2223 Euro
    0 references
    1,131,247.42 zloty
    0 references
    251,476.3 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    10 July 2020
    0 references
    30 January 2022
    0 references
    OPOLSKIE CENTRUM REHABILITACJI W KORFANTOWIE SP. Z O.O.
    0 references
    0 references

    50°29'16.8"N, 17°35'54.2"E
    0 references
    Przedmiotem projektu jest zakup specjalistycznego sprzętu medycznego niezbędnego do leczenia chorób cywilizacyjnych wywołanych schorzeniami sercowo - naczyniowymi na oddział rehabilitacji ogólnoustrojowej z pododdziałem neurologicznym i dział fizjoterapii, a ponadto przebudowa oddziału znajdującego się na parterze budynku - pawilon "B" w zakresie adaptacji części każdej z 5 sal na łazienkę z WC, przebudowania dwóch nieużytkowanych pomieszczeń szpitalnych na salę chorych wraz z węzłem sanitarnym oraz doprowadzenie instalacji gazów medycznych bezpośrednio do paneli przyłóżkowych. W ramach projektu wykonana zostanie instalacja fotowoltaiczna wspomagająca instalację elektryczną. W celu przekierowania dotychczasowego ruchu pacjentów oraz personelu medycznego innych oddziałów, który w związku z brakiem innej możliwości przemieszczają się na zabiegi z hydroterapii przez oddział rehabilitacji ogólnoustrojowej, zaplanowano budowę dodatkowego wejścia do Szpitala wraz ze schodami i windą dla osób niepełnosprawnych. Przedsięwzięcie realizowane będzie w Korfantowie przy ul. Wyzwolenia 11 (działka nr 483/14). Poniesione w ramach wkładu własnego oraz planowanego dofinansowania nakłady inwestycyjne na zakup aparatury medycznej wyniosą 180 802,50 zł. (Polish)
    0 references
    The subject of the project is the purchase of specialised medical equipment necessary for the treatment of civilisation diseases caused by cardiovascular diseases to the unit of systemic rehabilitation with neurological sub-unit and physiotherapy department, as well as the reconstruction of the branch located on the ground floor of the building – Pavilion “B” in terms of adapting parts of each of the 5 rooms to a bathroom with toilet, rebuilding two unused hospital rooms into a sick room with a sanitary node and bringing medical gas installations directly to the bedside panels. The project will carry out a photovoltaic installation supporting the electrical installation. In order to redirect the current movement of patients and medical staff of other branches, who, due to the lack of other possibilities, move to hydrotherapy treatments through the unit of systemic rehabilitation, it is planned to build an additional entrance to the Hospital with stairs and lift for people with disabilities. The project will be implemented in Korfantów at ul. Liberation 11 (plot No 483/14). The investment expenditure for the purchase of medical equipment incurred as part of the own contribution and the planned co-financing will amount to PLN 180 802.50. (English)
    8 July 2021
    0 references

    Identifiers

    RPOP.10.01.01-16-0010/20
    0 references