Extension of the TSO building together with the development of public space for social purposes in Gorenice in the municipality of Olkusz – tasks 6.1, 6.2 and 6.3 in the GPR. (Q2709308)

From EU Knowledge Graph
Revision as of 21:54, 7 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2709308 in Poland
Language Label Description Also known as
English
Extension of the TSO building together with the development of public space for social purposes in Gorenice in the municipality of Olkusz – tasks 6.1, 6.2 and 6.3 in the GPR.
Project Q2709308 in Poland

    Statements

    0 references
    2,283,295.48 zloty
    0 references
    507,576.59 Euro
    0.2223 Euro
    0 references
    2,750,958.49 zloty
    0 references
    611,538.07 Euro
    0.2223 Euro
    0 references
    83.0 percent
    0 references
    11 April 2018
    0 references
    30 June 2022
    0 references
    GMINA OLKUSZ
    0 references
    0 references

    50°16'43.7"N, 19°33'34.6"E
    0 references
    Projekt zakłada wykonanie 3 obiektów inwestycyjnych wraz z dostosowaniem ich do potrzeb osób niepełnosprawnych.I stworzenie strefy rekreacyjnej przy budynku szkoły od strony północnej w postaci elementów małej architektury, jak krąg ogniskowy z krawężników bet. o śr. 2,0m z ławkami 15 szt., koszami na śmieci 4 szt., oraz zacienione miejsce odpoczynku dla dzieci przy placu zabaw od strony południowej drewniana altana o wym. osiowych 4,0 x 4,0m. Wykonane zostanie także ogrodzenie ok. 146m i wysokości 1,8m oraz ciągi piesze o nawierzchni z kostki betonowej gr. 6 cm ok. 228m2 i kruszywa łamanego ok. 211 m2. Przewidziano nowe nasadzenia drzew. II zagospodarowanie terenu przy stadionie sportowym, z wydzieleniem miejsca pod siłownię zewnętrzną pow. ok. 166,91 m2 wraz z urządzeniami 6 szt.. Nowa nawierzchnia boiska wielofunkcyjnego na bezpieczną pow. ok. 291,94 m2, oraz nową infrastrukturę sportową, w tym: bramki aluminiowe, słupki do siatkówki, słupki do tenisa oraz kosze do koszykówki. Inwestycja obejmuje również rozbudowę oświetlenia całego terenu rekreacyjnego na słupach 11 projektorów LED o mocy 150W i 300W oraz oświetlenie przeciwwandalowe LED o mocy 30W i budowę ogrodzenia boiska wielofunkcyjnego dł. ok. 54,4m, chodnik, monitoring, prefab. siedzisk.III rozbudowa i przebudowa istniejącego budynku oraz instalacji wewnętrznych remizy OSP w Gorenicach wraz z częściową rozbiórką istniejącego budynku. Rozbudowa zakłada powstanie drugiego segmentu murowanego, niepodpiwniczonego, piętrowego o wymiarach 10x19,7m z dachem wielospadowym o konstrukcji krokwiowo jętkowym. Fundamenty wykonane jako ławy i stopy fundamentowe. Strop na parterem płyta żelbetowa monolityczna, strop nad piętrem gęsto żebrowy, chodnika o pow. ok. 87m2. Po realizacji pow. zabudowy 467,83m2, kubatura 3.548,00m3Rozbudowa powiększy salę spotkańzabaw i pozwoli na wprowadzenie do obiektu nowych funkcji m.in. świetlicy dla Koła Gospodyń Wiejskich oraz świetlicy dla młodzieży. (Polish)
    0 references
    The project involves the construction of 3 investment objects with adaptation to the needs of people with disabilities.And the creation of a recreation area next to the school building from the north side in the form of elements of small architecture, such as a focal circle from the curbs of bet. 2.0 m with benches 15 pieces, waste bins 4 pieces, and a shaded rest area for children at the playground on the south side of a wooden gazebo with axial weight of 4.0 x 4.0 m. A fence will also be made. 146 m and 1.8 m high and pedestrian tracks with concrete cube surface 6 cm approx. 228 m² and broken aggregate approx. 211 m². New tree plantings are planned. II development of the area next to the sports stadium, with space for the outdoor gym area approx. 166,91 m² with 6 units. New surface of the multi-purpose pitch for a safe area approx. 291,94 m², and new sports infrastructure, of which: aluminium gates, volleyball posts, tennis posts and basketball baskets. The investment also includes the extension of the lighting of the entire recreational area on the poles of 11 LED projectors with a power of 150 W and 300 W, as well as LED vandal lighting with a power of 30 W and the construction of a multifunctional field fence approx. 54,4 m, pavement, monitoring, prefab. III. extension and reconstruction of the existing building and installation of the internal fire station of the TSO in Gorenice, together with partial demolition of the existing building. The extension assumes the creation of a second brick, non-base, double-storey segment with dimensions of 10x19.7 m with a multi-fall roof with a rafter-barrowed structure. Foundations made as benches and foundation feet. Ceiling on the ground floor reinforced concrete plate monolithic, a ceiling above the floor densely rib, a sidewalk with an area of approx. 87 m². After the construction of the building area of 467.83 m², a volume of 3.548,00m3The extension will enlarge the meeting room and allow the introduction to the facility of new functions, among others, a common room for the Housewives’ Circle and a common room for young people. (English)
    7 July 2021
    0 references

    Identifiers

    RPMP.11.02.00-12-0016/19