9/4.5 ROAD SYSTEM OF AV. NO. OF FATIMA AND AV. General HUMBERTO DELGADO (Studies and Projects) (Q2878162)

From EU Knowledge Graph
Revision as of 21:05, 7 July 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2878162 in Portugal
Language Label Description Also known as
English
9/4.5 ROAD SYSTEM OF AV. NO. OF FATIMA AND AV. General HUMBERTO DELGADO (Studies and Projects)
Project Q2878162 in Portugal

    Statements

    0 references
    1,895,546.6 Euro
    0 references
    85.0 percent
    0 references
    21 April 2017
    0 references
    31 August 2021
    0 references
    MUNICÍPIO DE LEIRIA
    0 references
    Q2990815 (Deleted Item)
    0 references

    39°44'14.06"N, 8°48'26.35"W
    0 references
    A primeira alteração proposta pelo promotor é de natureza temporal. Pretende-se alterar a data de fim da operação, de acordo com a execução física da empreitada de obra, com o consequente ajustamento da distribuição anual do investimento elegível. (Portuguese)
    0 references
    The first amendment proposed by the promoter is of a temporal nature. It is intended to change the end date of the operation according to the physical execution of the workstation, with the consequent adjustment of the annual distribution of the eligible investment. (English)
    7 July 2021
    0 references
    Leiria, União das freguesias de Leiria, Pousos, Barreira e Cortes
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000037
    0 references