No label defined (Q2706122)

From EU Knowledge Graph
Revision as of 20:23, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The property located in Sitaniec 127 d near Zamość is designed for office and workshop activities. One-storey building, not basemented, with traditional brick construction, covered with a gable roof. PVC windows, surprises with PVC and wooden-metal gates. Current partitions do not provide adequate thermal protection of the building. The facility is heated by a central heating installation powered by an electric boiler located in the building (of...)
Jump to navigation Jump to search
Project Q2706122 in Poland
Language Label Description Also known as
English
No label defined
Project Q2706122 in Poland

    Statements

    0 references
    377,404.63 zloty
    0 references
    83,897.05 Euro
    0.2223 Euro
    0 references
    580,622.53 zloty
    0 references
    129,072.39 Euro
    0.2223 Euro
    0 references
    65.0 percent
    0 references
    2 November 2019
    0 references
    30 July 2021
    0 references
    RECYKLING TADEUSZ BONDYRA
    0 references
    0 references

    50°41'30.5"N, 23°12'25.6"E
    0 references
    Obiekt położony w Sitańcu 127 d koło Zamościa przeznaczony jest na działalność biurowo - warsztatową. Budynek parterowy, niepodpiwniczony podpiwniczony, o konstrukcji murowanej tradycyjnej, pokryty dachem dwuspadowym. Okna PCV, dziwi z PCV i bramy drewniano-metalowe. Obecne przegrody nie zapewniają odpowiedniej ochrony cieplnej budynku. Obiekt ogrzewany jest za pomocą instalacji c.o. zasilanej z kotła elektrycznego umiejscowionego w budynku ( część biurowa ), pieca na paliwo stałe ( część warsztatowa ). C.w.u. realizowana jest za pomocą elektrycznych podgrzewaczy przepływowych. Obiekt wyposażony jest w instalacje: wentylacji grawitacyjnej, c.o.., elektryczną, wodno-kanalizacyjną i deszczową. Instalację oświetlenia oparto na świetlówkach indukcyjnych i oprawach żarowych. Proponowana termomodernizacja obejmuje: ? wymianę okien i drzwi i bram ? ocieplenie stropu i dachu ? ocieplenie ścian zewnętrznych ? modernizację systemu c.o. zastosowanie jednolitego systemu w oparciu o powietrzną pompę ciepła wraz z opomiarowaniem (liczniki), ? wymianę oświetlenia wbudowanego na oświetlenie typu LED , ? montaż paneli fotowoltaicznych ? zastosowanie systemu zarządzania energią. (Polish)
    0 references
    The property located in Sitaniec 127 d near Zamość is designed for office and workshop activities. One-storey building, not basemented, with traditional brick construction, covered with a gable roof. PVC windows, surprises with PVC and wooden-metal gates. Current partitions do not provide adequate thermal protection of the building. The facility is heated by a central heating installation powered by an electric boiler located in the building (office part), a solid fuel furnace (workshop part). C.W.U. is realised with electric flow heaters. The facility is equipped with installations: gravity ventilation, central heating, electrical, plumbing and rainwater. The lighting installation is based on induction fluorescent lamps and luminaires. The proposed thermomodernisation includes: replacement of windows and doors and gate warming of the ceiling and roof? warming of external walls? modernisation of the heating system, application of a uniform system based on the air heat pump together with metering (counters), replacement of the built-in lighting for LED lighting, installation of photovoltaic panels? application of energy management system. (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.05.01.00-06-0084/19
    0 references