Requalification and coastal protection of Pocinho, Pico (Q2853811)

From EU Knowledge Graph
Revision as of 18:07, 7 July 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2853811 in Portugal
Language Label Description Also known as
English
Requalification and coastal protection of Pocinho, Pico
Project Q2853811 in Portugal

    Statements

    0 references
    0 references
    69,198.93 Euro
    0 references
    85.0 percent
    0 references
    10 October 2019
    0 references
    31 October 2021
    0 references
    DIRECÇÃO REGIONAL DOS ASSUNTOS DO MAR
    0 references
    0 references

    38°32'10.75"N, 28°31'27.66"W
    0 references
    A presente operação consiste na execução de solução referente ao Prolongamento e Reforço da Proteção Marginal do Pocinho, na Ilha do Pico, através da execução de intervenções em duas zonas, tal como previsto no projeto de execução:ZONA DE INTERVENÇÃO 1 - Remoção do enrocamento existente de modo a permitir a sua recolocação em duas camadas Reposição do enrocamento do manto de proteção, em duas camadas, com enrocamento de 10 a 20 kNs Colmatação (Portuguese)
    0 references
    The present operation consists of the implementation of a solution related to the extension and reinforcement of the Marginal Protection of Pocinho, on Pico Island, through the execution of interventions in two zones, as foreseen in the implementation project: INTERVENTION ZONE 1 – Removal of the existing screwing in order to allow its relocation in two layers Replacement of the protective mantle, in two layers, with screwing of 10 to 20 kN (English)
    6 July 2021
    0 references
    Madalena
    0 references

    Identifiers

    ACORES-05-1809-FEDER-000029
    0 references