No label defined (Q2699358)

From EU Knowledge Graph
Revision as of 17:24, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Project entitled The “Establishment of an Environmental Activity Centre” (SEC) includes the adaptation of rooms of the second floor building. “B” SP3 for the creation of a SCA together with adjacent surroundings – school pitches. The SCA will be the base of premises. for the implementation of social projects within the framework of the GPR. The project involves the construction of a transport-lift route at the building “B” (for people under and...)
Jump to navigation Jump to search
Project Q2699358 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699358 in Poland

    Statements

    0 references
    4,422,887.55 zloty
    0 references
    983,207.9 Euro
    0.2223 Euro
    0 references
    6,370,451.94 zloty
    0 references
    1,416,151.47 Euro
    0.2223 Euro
    0 references
    69.43 percent
    0 references
    26 April 2019
    0 references
    30 November 2021
    0 references
    GMINA MIASTO CHEŁMŻA
    0 references
    Q2520195 (Deleted Item)
    0 references

    53°11'32.6"N, 18°36'45.4"E
    0 references
    Projekt pn. „Utworzenie Środowiskowego Centrum Aktywności”(ŚCA) obejmuje adaptację pomieszczeń II piętra bud. „B” SP3 na potrzeby utworzenia ŚCA wraz z zagospod. przyległego otoczenia – boisk szkol. ŚCA będzie bazą lokal. dla realizacji projektów społ. w ramach GPR. Projekt zakłada budowę przy budynku "B" ciągu komunikacyjnego-windy (dla osób niepełnospr. i starszych) oraz zew. klatki schod. pełniącej dodatkową rolę drogi ewakuac. Powstaną pomieszczenia integrac-edukac., biurowe, socjalne, toalety oraz szatnia wraz z niezbędnym wyposaż. Ponadto zaplanowano zaadaptowanie pomieszczenia na cele gastronom.- bar wyposażony m.in. w sprzęt AGD oraz meble. Pomieszczenia będą nieodpłatnie udostępniane podm. realizującym rzeczone projekty, beneficjentami będą interesariusze rewitalizacji. Rewitalizacji poddane zostanie także otoczenie adaptowanego budynku. Zaplanowano modernizację boisk szkol. - SP2 i 3 oraz Przedszkola Miejskiego (PM) nr 2. Na terenie boisk szkol. powstaną 2 boiska wielofunkc. z nawierzchnią bezp., skocznia do skoku w dal, bieżnia i boisko do gry w bule. Nawierzchnie asfalt. boisk zostaną zastąpione betonowymi wykonanymi z kostki betonowej. Zamontowane zostaną elem. małej architektury: ławki, kosze na śmieci i stojaki na rowery oraz urządzenia placu zabaw dla dzieci i siłowni zew. dla seniorów wraz z oświetleniem i nawierzchnią sport./bezpieczną. W celu poprawy bezpieczeństwa, zaplanowano przebudowę ul. Hallera na odc. między ul. Skargi a ul. Mickiewicza, polegającą na wykonaniu jezdni z wydzieleniem na poboczu miejsc postojowych dla samochodów osob. wraz z wprowadzeniem ruchu jednokierunkowego. Na terenie przedsięwzięcia planuje się remont ogrodzenia SP2 i 3, MOPS, PM2 polegający na przemurowaniu i wymianie elementów. Przewidziano wymianę ogrodzenia wokół zabytkowej wieży ciśnień. Prace będą polegały na rozbiórce istniejącego ogrodzenia i wykonaniu nowego na wzór ogrodzenia wokół szkół. (Polish)
    0 references
    Project entitled The “Establishment of an Environmental Activity Centre” (SEC) includes the adaptation of rooms of the second floor building. “B” SP3 for the creation of a SCA together with adjacent surroundings – school pitches. The SCA will be the base of premises. for the implementation of social projects within the framework of the GPR. The project involves the construction of a transport-lift route at the building “B” (for people under and above) and a staircase with an additional role as an evacuation route. Integrac-edukac., office, social, toilets and cloakrooms will be built together with the necessary equipment. In addition, it is planned to adapt the room for catering purposes.- a bar equipped with household appliances and furniture. The premises will be made available free of charge to the entities implementing the projects in question, the beneficiaries will be the stakeholders of the revitalisation. The surroundings of the adapted building will also be revitalised. Modernisation of the school fields is planned. — SP2 and 3 and Municipal Kindergarten (PM) No. 2. There will be 2 multifunctional pitches with a free surface, a long jumping hill, a treadmill and a pitch for boules. Surfaces of asphalt. pitches will be replaced by concrete made of concrete cubes. Small architecture will be installed: benches, trash bins and bike racks as well as children’s playground and gym equipment for seniors along with lighting and sports surface./safe. In order to improve safety, it is planned to rebuild ul. Hallera at a distance between st. Complaints and st. Mickiewicza, which consists of making a roadway separated on the side of parking spaces for cars. with the introduction of one-way traffic. On the site of the project it is planned to renovate the fences SP2 and 3, MOPS, PM2 consisting of walling and replacement of elements. It is planned to replace the fence around the historic water tower. The work will consist of demolishing the existing fence and making a new fence on the model around the schools. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.06.04.01-04-0005/20
    0 references