Modernisation of the Oder Weirs on the section of the Management Board of RZGW Gliwice – Opolskie Voivodeship (Stage II) (Q2693010)

From EU Knowledge Graph
Revision as of 14:56, 7 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2693010 in Poland
Language Label Description Also known as
English
Modernisation of the Oder Weirs on the section of the Management Board of RZGW Gliwice – Opolskie Voivodeship (Stage II)
Project Q2693010 in Poland

    Statements

    0 references
    0 references
    130,843,908.92 zloty
    0 references
    29,086,600.95 Euro
    0.2223 Euro
    0 references
    153,934,010.5 zloty
    0 references
    34,219,530.53 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 February 2017
    0 references
    31 March 2023
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE
    0 references
    0 references

    50°53'30.8"N, 17°55'55.6"E
    0 references
    Przedmiotowy projekt zakłada modernizację trzech jazów zlokalizowanych na Odrze: Krępa, Dobrzeń, Groszowice w celu przystosowania Odry do III klasy drogi wodnej. Inwestycja przyczyni się do poprawy warunków eksploatacji obiektów w aspekcie ich bezawaryjności, a tym samym sprawności sterowania procesem przepuszczania wód przez analizowane jazy, które w obecnym stanie technicznym nastręczają wielu problemów eksploatacyjnych wynikających z częstych awarii, z którymi wiąże się brak możliwości właściwego manewrowania zamknięciami i utrzymania właściwego poziomu wody żeglownej. Przebudowa obiektów ma także na celu poprawę stanu urządzeń i elementów wyposażenia technologicznego w aspekcie ich użyteczności eksploatacyjnej, sterowania i komunikacyjnej, zabezpieczenia przed kradzieżą i aktami wandalizmu, jak również udrożnienie odcinka rzeki dla potrzeb ryb tzw. dwuśrodowiskowych, przy jednoczesnym zapewnieniu należytych parametrów i stanu technicznego obiektów. (Polish)
    0 references
    The project involves the modernisation of three weirs located on the Oder: Tight, Well, Groszowice to adapt the Oder to the third class of the waterway. The investment will contribute to improving the operating conditions of the facilities in terms of their failure-freeness, and thus the efficiency of controlling the process of passing water through the analysed weirs, which, in the current technical condition, present many operational problems resulting from frequent failures, which result in the impossibility of properly manoeuvring closures and maintaining an appropriate level of navigable water. The reconstruction of the facilities also aims at improving the condition of equipment and technological equipment in terms of their operational, control and communication usability, protection against theft and vandalism, as well as the opening of a river section for so-called two-environment fish, while ensuring proper parameters and technical condition of the facilities. (English)
    7 July 2021
    0 references

    Identifiers

    POIS.03.02.00-00-0073/19
    0 references