“Building of a photovoltaic farm on the Left Beach Wastewater Treatment Plant”
Project Q2692708 in Poland

    Statements

    0 references
    8,307,919.24 zloty
    0 references
    1,846,850.45 Euro
    0.2223 Euro
    0 references
    9,774,022.64 zloty
    0 references
    2,172,765.23 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 October 2018
    0 references
    31 May 2022
    0 references
    PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    52°10'53.0"N, 18°12'55.4"E
    0 references
    ZAKRES RZECZOWY : Na konstrukcjach wsporczych zlokalizowanych na gruncie zamontowane zostanie 5940 szt. paneli fotowoltaicznych o mocy nominalnej 330 Wp, o łącznej mocy 1,96 MW. Wysokość konstrukcji naziemnych nie przekroczy 4 m. Budowy wiaty na osad odwodniony z instalacją fotowoltaiczną o łącznej mocy 222,75 kW wraz z niezbędną infrastrukturą elektroenergetyczną na terenie istniejącej Oczyszczalni Ścieków Lewy Brzeg. Na dachu wiaty na osad odwodniony zamontowane zostanie 675 szt. paneli fotowoltaicznych o mocy nominalnej 330 Wp. Montaż towarzyszącej infrastruktury elektroenergetycznej tj. instalacji niskiego napięcia, dwóch kontenerów technologicznych z transformatorami, konstrukcji wsporczych dla paneli PV, instalacji teletechnicznych, AKPiA i monitoringu oraz przyłączy kablowych SN. (Polish)
    0 references
    MATERIAL SCOPE: 5940 photovoltaic panels with a nominal power of 330 Wp, with a total capacity of 1.96 MW, will be installed on the supporting structures located on the ground. The height of ground structures will not exceed 4 m. Construction of a shelter for dehydrated sediment with a photovoltaic installation with a total power of 222,75 kW, together with the necessary electricity infrastructure in the existing Lewy Brzeg Wastewater Treatment Plant. 675 photovoltaic panels with a nominal power of 330 Wp will be installed on the roof of the drained sediment roof. Installation of associated electricity infrastructure, i.e. low-voltage installation, two process containers with transformers, supporting structures for PV panels, teletechnical installations, ACPiA and monitoring, and cable connections of the SN. (English)
    7 July 2021
    0 references

    Identifiers

    POIS.01.01.01-00-0006/18