No label defined (Q2883678)

From EU Knowledge Graph
Revision as of 12:32, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets, translated_summary)
Jump to navigation Jump to search
Project Q2883678 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2883678 in Portugal

    Statements

    0 references
    0 references
    41,213,398.81 Euro
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    SECRETARIA REGIONAL DE EQUIPAMENTOS E INFRAESTRUTURAS
    0 references

    32°39'51.59"N, 16°59'31.67"W
    0 references
    A infraestrutura rodoviária, com 2,5km de extensão, inclui a execução dos seguintes trabalhos:• 2,498 Km de plena via • 2 Túneis unidireccionais, um de 330m e outro de 390m• 5 Viadutos, numa extensão total de 871m• 8 Obras de arte Correntes (PI, PS, PA e PP) numa extensão acumulada de 360 m• 7 Restabelecimentos à rede viária existente• 3 Rotundas • 3 Arruamentos de ligação (Portuguese)
    0 references
    The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets (English)
    7 July 2021
    0 references
    Câmara de Lobos, Câmara de Lobos
    0 references

    Identifiers

    M1420-06-2756-FEDER-000002
    0 references