Requalification of the public space of the parishes of Rosa, Ingote and Ex-IGAPHE (IHRU) -1st Phase (Q2878397)

From EU Knowledge Graph
Revision as of 10:08, 7 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2878397 in Portugal
Language Label Description Also known as
English
Requalification of the public space of the parishes of Rosa, Ingote and Ex-IGAPHE (IHRU) -1st Phase
Project Q2878397 in Portugal

    Statements

    0 references
    736,853.47 Euro
    0 references
    85.0 percent
    0 references
    2 April 2018
    0 references
    30 June 2022
    0 references
    MUNICÍPIO DE COIMBRA
    0 references

    40°14'55.00"N, 8°24'12.35"W
    0 references
    A operação consiste na: Zona 1: Reabilitação do eixo Rua Cidade de Cambridge Bairro da Rosa – 8.500 m2 na Zona 2: Reabilitação da área norte do Bairro do Ingote – 4.000 m2 ( reabilitação e introdução de uma zona de Merendas) e na Zona 3: Reabilitação da área poente do Bairro do Ingote – 2.500 m2 (criação de acessibilidades e extensão das Hortas Urbanas na zona poente) (Portuguese)
    0 references
    The operation consists of: Zone 1: Rehabilitation of the axis Street City of Cambridge Freguesia da Rosa 8,500 m² in Zone 2: Rehabilitation of the northern area of the parish of Ingote 4,000 m² (rehabilitation and introduction of an area of Merendas) and Zone 3: Rehabilitation of the west area of the parish of Ingote 2.500 m² (creation of accessibility and extension of the Urban Gardens in the west area) (English)
    7 July 2021
    0 references
    Coimbra, União das freguesias de Eiras e São Paulo de Frades
    0 references

    Identifiers

    CENTRO-09-4943-FEDER-000042
    0 references