No label defined (Q2878153)

From EU Knowledge Graph
Revision as of 09:55, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Improvement of the Gouveia Transport Interface through the construction of a complementary interface to the existing Central Transportation Centre, as well as the external recovery of the Central Transport Building and immediately adjoining space., translated_summary)
Jump to navigation Jump to search
Project Q2878153 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2878153 in Portugal

    Statements

    0 references
    207,225.11 Euro
    0 references
    85.0 percent
    0 references
    26 March 2018
    0 references
    31 December 2018
    0 references
    MUNICÍPIO DE GOUVEIA
    0 references

    40°29'38.44"N, 7°35'30.41"W
    0 references
    Melhoria do Interface de Transportes de Gouveia através da Construção de um Interface complementar à Central de Transportes existente, assim como a recuperação exterior do edifício da Central de Transportes e espaço imediatamente contíguo. (Portuguese)
    0 references
    Improvement of the Gouveia Transport Interface through the construction of a complementary interface to the existing Central Transportation Centre, as well as the external recovery of the Central Transport Building and immediately adjoining space. (English)
    7 July 2021
    0 references
    Gouveia, União das freguesias de Gouveia (São Pedro e São Julião)
    0 references

    Identifiers

    CENTRO-09-1406-FEDER-000026
    0 references