Basic School of Santa Iria_Tomar (Q2871094)

From EU Knowledge Graph
Revision as of 08:40, 7 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2871094 in Portugal
Language Label Description Also known as
English
Basic School of Santa Iria_Tomar
Project Q2871094 in Portugal

    Statements

    0 references
    122,813.99 Euro
    0 references
    85.0 percent
    0 references
    25 January 2021
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE TOMAR
    0 references

    39°35'51.76"N, 8°23'49.02"W
    0 references
    A presente operação visa a substituição das coberturas dos edifícios que integram a Escola Básica de Santa Iria, coberturas essas que são em chapa de fibrocimento contendo amianto na sua composição, por uma cobertura de painel sandwich com 50mm de espessura. Face aos riscos que o amianto representa para a saúde pública a intervenção proposta assume-se como prioritária, respondendo a uma preocupação da comunidade escolar. (Portuguese)
    0 references
    The present operation aims to replace the roofs of the buildings that are part of the Basic School of Santa Iria, coverings that are made of asbestos cement sheet in its composition, with a sandwich panel covering 50 mm thick. Given the risks posed by asbestos to public health, the proposed intervention is a priority, responding to a concern of the school community. (English)
    7 July 2021
    0 references
    Tomar, União das freguesias de Tomar (São João Baptista) e Santa Maria dos Olivais
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000251
    0 references