Enhancement of the efficiency of the production of the plecan in J.M.KAPA s.r.o. (Q13076)

From EU Knowledge Graph
Revision as of 11:24, 25 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project aims at further improving the efficiency of the production of the in-can structure in the firm J.M.KAPA, s.r.o. does not just deal with the purchase of technology, but logically follows up on the third part of the company’s reconstruction aiming at modernising manufacturing and handling facilities at the site and streamlining the production flows through the integration of both existing and purchased technology together with the stor...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Enhancement of the efficiency of the production of the plecan in J.M.KAPA s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,400,000.0 Czech koruna
    0 references
    336,000.0 Euro
    10 January 2020
    0 references
    24,000,000.0 Czech koruna
    0 references
    960,000.0 Euro
    10 January 2020
    0 references
    35 percent
    0 references
    31 December 2017
    0 references
    J.M.KAPA, s.r.o.
    0 references
    0 references

    50°1'58.19"N, 15°11'23.86"E
    0 references
    28002
    0 references
    Projekt je zaměřen na další zvýšení efektivity výroby plechových konstrukcí ve firmě J.M.KAPA,s.r.o. Neřeší pouze nákup technologie, ale logicky navazuje na třetí část rekonstrukce firmy, jejímž cílem je zmodernizovat výrobní a manipulační prostory v areálu a zefektivnit výrobní toky formou integrace stávající i nakupované technologie společně se skladovým hospodářstvím do výrobního systému. Doba realizace projektu bude 23,5 měsíců, zahájení projektu v 01/2016 a ukončení ve 12/2017. a. (Czech)
    0 references
    The project aims at further improving the efficiency of the production of the in-can structure in the firm J.M.KAPA, s.r.o. does not just deal with the purchase of technology, but logically follows up on the third part of the company’s reconstruction aiming at modernising manufacturing and handling facilities at the site and streamlining the production flows through the integration of both existing and purchased technology together with the storage economy stock to the production system. The duration of the project will be 23,5 months, the start of the project in 01/2016 and the closure in 12/2017. a. (English)
    0 references

    Identifiers

    CZ.01.2.06/0.0/0.0/15_038/0006299
    0 references