Intervention in the terrestrial logistics circuits of S. Miguel – Rehabilitation and improvement of a section of ER 1-1.ª, between Rosario (Ribeira Grande) and Ribeirinha (Q2854023)

From EU Knowledge Graph
Revision as of 12:43, 6 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2854023 in Portugal
Language Label Description Also known as
English
Intervention in the terrestrial logistics circuits of S. Miguel – Rehabilitation and improvement of a section of ER 1-1.ª, between Rosario (Ribeira Grande) and Ribeirinha
Project Q2854023 in Portugal

    Statements

    0 references
    461,632.86 Euro
    0 references
    85.0 percent
    0 references
    9 June 2015
    0 references
    7 May 2018
    0 references
    SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
    0 references
    Esta operação consiste numa intervenção a efetuar na Estrada Regional nº 1-1ª, entre o Largo do Rosário, na Freguesia da Matriz da Ribeira Grande, e a rotunda do nó do IPO na Freguesia da Ribeirinha, numa extensão de 2.4 km.A operação integra, trabalhos de construção de novo sistema de drenagem, uma vez que o atual troço apresenta graves problemas de drenagem e trabalhos de pavimentação, com a aplicação de nova camada de desgaste em toda a exte (Portuguese)
    0 references
    This operation consists of an intervention to be carried out on the Regional Road No. 1-1ª, between Largo do Rosário, in the parish of the Matriz da Ribeira Grande, and the roundabout of the node of the IPO in the parish of Ribeirinha, an extension of 2,4 km.The operation integrates, construction works of new drainage system, since the current section presents serious problems of drainage and paving work, with the application of a new layer of wear throughout the exte (English)
    6 July 2021
    0 references
    Ribeira Grande
    0 references

    Identifiers

    ACORES-07-2756-FEDER-000005
    0 references