Intervention in the terrestrial logistical circuits of Santa Maria – Rehabilitation of a section of the ER between Arrebentão and the Sand Watch, S. Lourenço (Q2854022)

From EU Knowledge Graph
Revision as of 12:43, 6 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2854022 in Portugal
Language Label Description Also known as
English
Intervention in the terrestrial logistical circuits of Santa Maria – Rehabilitation of a section of the ER between Arrebentão and the Sand Watch, S. Lourenço
Project Q2854022 in Portugal

    Statements

    0 references
    531,852.51 Euro
    0 references
    85.0 percent
    0 references
    10 September 2014
    0 references
    7 May 2018
    0 references
    SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
    0 references
    A operação consiste na requalificação da E.R. entre o Arrebentão e a Vigia da Areia (São Lourenço) sito na ilha de Santa Maria numa extensão total de 3.354m, sendo que na zona litoral da Baía de São Lourenço (num comprimento de 1.029m) a intervenção apenas considera a sinalização vertical e horizontal.Para além da requalificação da estrada, estão previstos trabalhos de colocação de sinalização vertical e horizontal em toda a sua extensão (desde (Portuguese)
    0 references
    The operation consists of the requalification of the E.R. between Arrebentão and the Sand Watch (São Lourenço) on the island of Santa Maria for a total length of 3,354 m, and in the coastal area of the Bay of São Lourenço (in a length of 1,029 m) the intervention only considers the vertical and horizontal signage.In addition to the requalification of the road, work to place vertical and horizontal signalling are planned throughout its extension (since the requalification of the road). (English)
    6 July 2021
    0 references
    Vila do Porto
    0 references

    Identifiers

    ACORES-07-2756-FEDER-000004
    0 references