Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs. (Q2778302)

From EU Knowledge Graph
Revision as of 12:34, 5 July 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2778302 in Greece
Language Label Description Also known as
English
Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs.
Project Q2778302 in Greece

    Statements

    0 references
    46,488,000.0 Euro
    0 references
    85.0 percent
    0 references
    29 May 2020
    0 references
    31 December 2023
    0 references
    ΕΡΓΟΣΕ ΑΕ
    0 references
    0 references
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references

    40°54'2.41"N, 22°57'19.80"E
    0 references
    Στο πλαίσιο του έργου θα υλοποιηθεί η εγκατάσταση συστήματος Σηματοδότησης - Τηλεδιοίκησης ETCS (European Train Control System) Level 1, της μονής σιδηροδρομικής γραμμής Θεσσαλονίκη - Ειδομένη, με σκοπό τη μεγιστοποίηση της ασφάλειας των επιβατικών και εμπορευματικών σιδηροδρομικών μεταφορών και τη συμμόρφωση με τις αρχές της Διαλειτουργικότητας. (Greek)
    0 references
    In the framework of the project, the installation of the ETCS (European Train Control System) Level 1, the single railway line Thessaloniki – Idomeni, will be implemented in order to maximise the safety of passenger and freight rail transport and to comply with the principles of Interoperability. (English)
    2 July 2021
    0 references

    Identifiers

    5.041.829
    0 references