Construction hall production hall P+ 1, drilling, vacuum tank, field enclosure, concrete platform (Q2743724)

From EU Knowledge Graph
Revision as of 11:45, 17 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Creation of a production unit, consisting of the construction of a production space and its corresponding endowment with equipment used in knitting production 2. in implementing and accessing standards to develop the activity to market standards, especially through specialised equipment 3. Ensuring the smooth implementation of a project with non-reimbursable financing, until the end of the implementation period through the procurement of special...)
Jump to navigation Jump to search
Project Q2743724 in Romania
Language Label Description Also known as
English
Construction hall production hall P+ 1, drilling, vacuum tank, field enclosure, concrete platform
Project Q2743724 in Romania

    Statements

    0 references
    950,942.54 Romanian Leu
    0 references
    190,188.50800000003 Euro
    15 June 2021
    0 references
    1,792,473.2400000002 Romanian Leu
    0 references
    358,494.64800000004 Euro
    15 June 2021
    0 references
    0.53 percent
    0 references
    15 June 2018
    0 references
    30 June 2022
    0 references
    SC EUROLTA SRL
    0 references
    Crearea unei unitati de productie, constand in construirea unui spatiu de productie si dotarea corespunzatoare a acestuia cu echipamente utilizate in productia de tricotaje 2. in implementarea si accesarea unor norme care sa dezvolte activitatea la standardele pietei, in special, prin aparatura de specialitate 3. Asigurarea derularii in bune conditii a unui proiect cu finantare nerambursabila, pana la sfarsitul perioadei de in implementare prin achizitia de servicii de specialitate (Romanian)
    0 references
    Creation of a production unit, consisting of the construction of a production space and its corresponding endowment with equipment used in knitting production 2. in implementing and accessing standards to develop the activity to market standards, especially through specialised equipment 3. Ensuring the smooth implementation of a project with non-reimbursable financing, until the end of the implementation period through the procurement of specialised services (English)
    17 June 2021
    0 references
    DJ, loc.Pielesti, str.Islaz nr.10
    0 references

    Identifiers

    116093
    0 references