Energy renovation of the Primary School, Vladimir Nazora Škbrat (Q2733185)

From EU Knowledge Graph
Revision as of 12:54, 3 June 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q2733185 in Croatia
Language Label Description Also known as
English
Energy renovation of the Primary School, Vladimir Nazora Škbrat
Project Q2733185 in Croatia

    Statements

    0 references
    1,342,811.81 Croatian kuna
    0 references
    174,565.54 Euro
    2 June 2021
    0 references
    3,569,762.19 Croatian kuna
    0 references
    464,069.08 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    16 October 2018
    0 references
    16 October 2020
    0 references
    Osnovna škola Vladimira Nazora - Škabrnje
    0 references

    44°5'24.68"N, 15°27'4.36"E
    0 references
    23223
    0 references
    Provedbene mjere energetske učinkovitosti (kombinacija pet građevinskih, jedna elektrotehnička i jedna strojarska mjera) odnose se na Osnovnu školu Vladimira Nazora u Škabrnji:- ugradnja toplinske izolacije vanjskih zidova i poda prema vanjskom prostoru- ugradnja toplinske izolacije stropa prema tavanu - ugradnja toplinske i hidroizolacije krovova iznad grijanog- zamjena vanjske stolarije- modernizacija unutarnje rasvjete- ugradnja termostatskih ventilašto će rezultirati uštedom energije za grijanje 50,01% u odnosu na postojeće stanje. Nakon izvršene rekonstrukcije, očekivani razred je "B". (Croatian)
    0 references
    Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — modernisation of internal lighting ventilation, leading to a 50.01 % heating saving compared to the existing situation. The expected class is ‘B’ after the completion of the reconstruction. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0415
    0 references