No label defined (Q2733157)

From EU Knowledge Graph
Revision as of 12:54, 3 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The municipality of Prime train aims to increase the energy efficiency of the fire home building, which is located at K.č. 1399/2 k.o. Pritrain with a total gross construction area of 428.25 m². In line with the design of the main project, the proposed energy renovation measures will be implemented to reduce primary and thermal energy consumption as well as to increase the energy performance of the building. The realisation of the project will h...)
Jump to navigation Jump to search
Project Q2733157 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733157 in Croatia

    Statements

    0 references
    414,314.41 Croatian kuna
    0 references
    53,860.87 Euro
    2 June 2021
    0 references
    647,729.49 Croatian kuna
    0 references
    84,204.83 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    30 November 2018
    0 references
    30 November 2020
    0 references
    OPĆINA PRIVLAKA
    0 references

    44°32'42.47"N, 14°27'44.39"E
    0 references
    32251
    0 references
    Općina Privlaka želi povećati energetsku učinkovitost zgrade vatrogasnog doma koji se nalazi na k.č. 1399/2 k.o. Privlaka ukupne građevinske bruto površine 428,25 m². Sukladno izrađenom glavnom projektu implementirati će se predložene mjere energetske obnove u cilju smanjenja potrošnje primarne i toplinske energije te povećanja energetske učinkovitosti zgrade. Realizacija projekta će imati višestruke koristi za Općinu i zaposlenike DVD-a Privlaka, kroz izravne energetske i financijske uštede, pozitivan utjecaj na okoliš te osiguranje boljih radnih uvjeta. (Croatian)
    0 references
    The municipality of Prime train aims to increase the energy efficiency of the fire home building, which is located at K.č. 1399/2 k.o. Pritrain with a total gross construction area of 428.25 m². In line with the design of the main project, the proposed energy renovation measures will be implemented to reduce primary and thermal energy consumption as well as to increase the energy performance of the building. The realisation of the project will have multiple benefits for the Municipality and the members of the train crew on board, through direct energy and financial savings, a positive environmental impact and ensuring better working conditions. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0373
    0 references