No label defined (Q2727849)

From EU Knowledge Graph
Revision as of 09:44, 3 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of this project is to draw up project and technical documentation and consequently to obtain the necessary building acts, on the basis of which it is planned to build a future building of the Science and Innovation Centre in Split, which is planned as a multi-functional structure comprising a scientific, technological and multimedia centre, of GBP 7.280 m². At the same time, a project is planned to produce a feasibility study with a cost...)
Jump to navigation Jump to search
Project Q2727849 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2727849 in Croatia

    Statements

    0 references
    6,724,778.79 Croatian kuna
    0 references
    874,221.24 Euro
    2 June 2021
    0 references
    7,911,504.46 Croatian kuna
    0 references
    1,028,495.58 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    29 June 2020
    0 references
    29 December 2022
    0 references
    SVEUČILIŠTE U SPLITU
    0 references

    43°30'29.27"N, 16°26'24.68"E
    0 references
    21000
    0 references
    Predmet ovog projekta je izrada projektno-tehničke dokumentacije i posljedično ishođenje potrebnog akta o gradnji na temelju kojih se planira izgradnja buduće zgrade Znanstveno-inovacijskog centra u Splitu koja je planirana kao multifunkcionalna građevina koja obuhvaća funkcije znanstvenog, tehnološkog i multimedijalnog centra, GBP 7.280 m2. Ujedno, projektom se planira izrada Studije izvodljivosti s analizom troškova i koristi temeljem koje se planira dobiti jasna slika analize stanja, opravdanosti ulaganja u buduću infrastrukturu i uporabu iste, a kroz segment uspostave organizacijske strukture i definiranje cjelovite vizije institucije prijavitelja. (Croatian)
    0 references
    The aim of this project is to draw up project and technical documentation and consequently to obtain the necessary building acts, on the basis of which it is planned to build a future building of the Science and Innovation Centre in Split, which is planned as a multi-functional structure comprising a scientific, technological and multimedia centre, of GBP 7.280 m². At the same time, a project is planned to produce a feasibility study with a cost-benefit analysis leading to a clear picture of the state of play, the justification for investing in future infrastructure and its use, and through the establishment of an organisational structure and the creation of a holistic vision on the part of the applicant institution. (English)
    3 June 2021
    0 references

    Identifiers

    KK.01.1.1.09.0035
    0 references