ENERGY UPGRADING OF THE CAPITAL OF THE CAPITAL OF THE CAPITAL (Q2073573)

From EU Knowledge Graph
Revision as of 14:58, 2 November 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q2073573 in Italy
Language Label Description Also known as
English
ENERGY UPGRADING OF THE CAPITAL OF THE CAPITAL OF THE CAPITAL
Project Q2073573 in Italy

    Statements

    0 references
    134,084.69 Euro
    0 references
    268,169.37 Euro
    0 references
    50.0 percent
    0 references
    21 September 2016
    0 references
    7 March 2019
    0 references
    20 October 2018
    0 references
    COMUNE DI SANT'ANNA D'ALFAEDO
    0 references
    0 references

    45°37'38.86"N, 10°57'5.58"E
    0 references
    RIQUALIFICAZIONE ENERGETICA DELLA PALESTRA DEL CAPOLUOGO: COLLEGAMENTO A RETE TELERISCALDAMENTO ESISTENTE, POSA CALDAIA RECUPERO CALORE ALL'IMPIANTO BIOGAS, ISOLAMENTO A CAPPOTTO PARETI PERIMETRALI, ISOLAMENTO TERMICO COPERTURA, SOSTITUZIONE DEI SERRAMENTI, SOSTITUZIONE ILLUMINAZIONE CON NUOVA A LED. (Italian)
    0 references
    ENERGY UPGRADING OF THE CAPITAL OF THE CAPITAL OF THE CAPITAL: EXISTING DISTRICT HEATING NETWORK, HEAT RECOVERY BOILER, HEAT RECOVERY OF THE BIOGAS PLANT, INSULATION OF THE SHELL OF EIGHT EDGE WALLS, THERMAL INSULATION COVERING, REPLACEMENT OF WINDOW FRAMES, REPLACEMENT OF LIGHTS AND NEW LEDS. (English)
    0 references

    Identifiers

    G85I16000060002
    0 references